{"id":169695,"date":"2026-01-28T02:33:21","date_gmt":"2026-01-27T23:33:21","guid":{"rendered":"https:\/\/buletin.de\/bucuresti\/?p=169695"},"modified":"2026-01-28T19:34:22","modified_gmt":"2026-01-28T16:34:22","slug":"primaria-sectorului-3-taie-1-000-de-treceri-de-pietoni-din-proiectul-de-suprainaltare-dar-costurile-cresc-la-85-de-milioane-de-euro","status":"publish","type":"post","link":"https:\/\/buletin.de\/bucuresti\/primaria-sectorului-3-taie-1-000-de-treceri-de-pietoni-din-proiectul-de-suprainaltare-dar-costurile-cresc-la-85-de-milioane-de-euro\/","title":{"rendered":"Prim\u0103ria Sectorului 3 renun\u021b\u0103 la 1.000 de treceri de pietoni din proiectul de supra\u00een\u0103l\u021bare, dar costurile cresc la 85 de milioane de euro"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><strong>Update 28 ianuarie:<\/strong> Proiectul a fost adoptat cu 19 voturi pentru \u0219i 10 ab\u021bineri, dup\u0103 aproximativ 30 de minute de dezbateri, \u00een care opozi\u021bia a pus sub semnul \u00eentreb\u0103rii oportunitatea investi\u021biei, invoc\u00e2nd risipa banului public pe studii de fezabilitate r\u0103mase \u00een sertarele Prim\u0103riei Sectorului 3. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>CITE\u0218TE \u0218I:<\/strong> <strong><a href=\"https:\/\/buletin.de\/bucuresti\/sector-3-115-000-de-euro-pentru-suprainaltarea-unei-singure-intersectii-cum-vor-arata-trecerile-de-pietoni-la-pret-de-apartament\/\">Sector 3 | 115.000 de euro pentru supra\u00een\u0103l\u021barea unei singure intersec\u021bii. Cum vor ar\u0103ta trecerile de pietoni la \u201epre\u021b de apartament\u201d<\/a><\/strong><\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>La finalul lui februarie 2025, Consiliul Local al Sectorului 3 a adoptat o serie de hot\u0103r\u00e2ri ce prevedeau supra\u00een\u0103l\u021barea a peste 1.700 de treceri de pietoni. La aproape un an distan\u021b\u0103, pe masa consilierilor ajunge un nou proiect de hot\u0103r\u00e2re prin care sunt abrogate toate cele 29 adoptate \u00een anii 2024 \u0219i 2025 cu privire la acest proiect.<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Acum, documentul prevede supra\u00een\u0103l\u021barea a doar 735 de intersec\u021bii sau treceri de pietoni. Practic, <a href=\"https:\/\/www.primarie3.ro\/\" target=\"_blank\" rel=\"noreferrer noopener\">Prim\u0103ria Sectorului 3<\/a> va renun\u021ba la peste 1.000 de obiective de investi\u021bii, dac\u0103 proiectul va trece de votul consilierilor locali \u00een \u0219edin\u021ba de miercuri, 28 ianuarie.<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>De\u0219i suprafa\u021ba de interven\u021bie ar urma s\u0103 scad\u0103 semnificativ, costurile totale vor cre\u0219te la 85 de milioane de euro (TVA inclus). <\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Reporterii Buletin de Bucure\u0219ti l-au contactat pe edilul Robert Negoi\u021b\u0103 pentru un punct de vedere, \u00eens\u0103 primarul Sectorului 3 a refuzat s\u0103 discute, acuz\u00e2nd redac\u021bia de \u201erea-inten\u021bie\u201d.<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>CITE\u0218TE \u0218I:<\/strong> <strong><a href=\"https:\/\/buletin.de\/bucuresti\/dosarul-ior-in-pericol-de-inchidere-apararea-mariei-cocoru-mizeaza-totul-pe-viciile-de-procedura-si-acuza-judecatorul-de-lipsa-de-impartialitate\/\" target=\"_blank\" rel=\"noreferrer noopener\">Dosarul IOR, \u00een pericol de \u00eenchidere: ap\u0103rarea Mariei Cocoru mizeaz\u0103 totul pe viciile de procedur\u0103 \u0219i acuz\u0103 judec\u0103torul de lips\u0103 de impar\u021bialitate<\/a><\/strong><\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-peste-1-000-de-treceri-de-pietoni-suprainal\u021bate-abandonate-in-tacere\">Peste 1.000 de treceri de pietoni supra\u00een\u0103l\u021bate, \u201eabandonate\u201d \u00een t\u0103cere<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>\u00cen \u0219edin\u021ba din 27 februarie 2025, consilierii locali ai Sectorului 3 au adoptat 29 de proiecte de hot\u0103r\u00e2ri care vizau supra\u00een\u0103l\u021barea trecerilor de pietoni, a\u0219a cum a scris Buletin de Bucure\u0219ti <a href=\"https:\/\/buletin.de\/bucuresti\/harta-primaria-sectorului-3-vrea-sa-amenajeze-peste-1-700-treceri-de-pietoni-suprainaltate-costurile-se-ridica-la-peste-65-milioane-euro\/\">aici<\/a>.<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Cumulat, proiectele vizau <strong>1.774 de obiective de investi\u021bii<\/strong>, \u00eencadrate \u00een trei categorii: treceri de pietoni simple (I), intersec\u021bii T (cu trei treceri de pietoni) \u0219i intersec\u021bii X (cu patru treceri de pietoni). <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Practic, Prim\u0103ria Sectorului 3 a contractat servicii de proiectare pentru \u00eentreg sectorul, potrivit declara\u021bilor \u0219efului Serviciului de Investi\u021bii de la acea vreme. Asta de\u0219i autoritatea local\u0103 nu identificase o surs\u0103 cert\u0103 de finan\u021bare, ci spera la o supracontractare de 200%.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201eNoi am luat decizia s\u0103 facem proiectare pentru toate intersec\u021biile \u0219i toate&nbsp;trecerile&nbsp;de pe raza Sectorului 3. Trebuie s\u0103 avem proiectele mature, trebuie s\u0103 avem cererile de finan\u021bare preg\u0103tite, \u00eempreun\u0103 cu colegii no\u0219tri de la Direc\u021bia de Strategii \u0219i vom aplica pe toat\u0103 suma pe care ghidul o scoate, inclusiv o supracontractare de 200%\u201d., declara Marius Popescu \u00een februarie 2025.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img fetchpriority=\"high\" decoding=\"async\" width=\"929\" height=\"678\" src=\"data:image\/gif;base64,R0lGODlhAQABAAAAACH5BAEKAAEALAAAAAABAAEAAAICTAEAOw==\" data-src=\"https:\/\/buletin.de\/bucuresti\/wp-content\/uploads\/2026\/01\/image_2025-03-04_142342629-1.png\" alt=\"\" class=\"wp-image-169802 lazyload\" data-sizes=\"auto\" data-srcset=\"https:\/\/buletin.de\/bucuresti\/wp-content\/uploads\/2026\/01\/image_2025-03-04_142342629-1.png 929w, https:\/\/buletin.de\/bucuresti\/wp-content\/uploads\/2026\/01\/image_2025-03-04_142342629-1-300x219.png 300w, https:\/\/buletin.de\/bucuresti\/wp-content\/uploads\/2026\/01\/image_2025-03-04_142342629-1-768x560.png 768w, https:\/\/buletin.de\/bucuresti\/wp-content\/uploads\/2026\/01\/image_2025-03-04_142342629-1-600x438.png 600w, https:\/\/buletin.de\/bucuresti\/wp-content\/uploads\/2026\/01\/image_2025-03-04_142342629-1-20x15.png 20w\" sizes=\"(max-width: 929px) 100vw, 929px\" \/><figcaption class=\"wp-element-caption\">Harta cu treceri de pietoni propuse pentru supra\u00een\u0103l\u021bare.<\/figcaption><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Din cele 1.774 de obiective de investi\u021bii, 160 fuseser\u0103 aprobate \u00eenc\u0103 din februarie 2024, \u00eens\u0103 au revenit pe masa Consiliului Local al Sectorului 3 \u00een februarie 2025 pentru aprobarea scumpirilor.<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Restul au trecut pentru prima dat\u0103 de votul Consiliului Local \u00een \u0219edin\u021ba din urm\u0103 cu un an. Durata estimat\u0103 de implementare era de aproximativ 30 zile (pentru fiecare obiectiv).<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La aproape un an distan\u021b\u0103 de la adoptarea celor 29 de hot\u0103r\u00e2ri, nu numai c\u0103 Prim\u0103ria Sectorului 3 nu a \u00eenaintat cu demersurile \u00een implementarea investi\u021biei, ci reia tot procesul deliberativ de la zero. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Concret, consilierii locali urmeaz\u0103 s\u0103 voteze abrogarea (n.r. &#8211; anularea) hot\u0103r\u00e2rilor anterioare, pentru a vota un nou proiect.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1000\" height=\"422\" src=\"data:image\/gif;base64,R0lGODlhAQABAAAAACH5BAEKAAEALAAAAAABAAEAAAICTAEAOw==\" data-src=\"https:\/\/buletin.de\/bucuresti\/wp-content\/uploads\/2026\/01\/image_2026-01-28_001429206-1000x422.png\" alt=\"treceri de pietoni\" class=\"wp-image-169803 lazyload\" data-sizes=\"auto\" data-srcset=\"https:\/\/buletin.de\/bucuresti\/wp-content\/uploads\/2026\/01\/image_2026-01-28_001429206-1000x422.png 1000w, https:\/\/buletin.de\/bucuresti\/wp-content\/uploads\/2026\/01\/image_2026-01-28_001429206-300x126.png 300w, https:\/\/buletin.de\/bucuresti\/wp-content\/uploads\/2026\/01\/image_2026-01-28_001429206-768x324.png 768w, https:\/\/buletin.de\/bucuresti\/wp-content\/uploads\/2026\/01\/image_2026-01-28_001429206-1100x464.png 1100w, https:\/\/buletin.de\/bucuresti\/wp-content\/uploads\/2026\/01\/image_2026-01-28_001429206-600x253.png 600w, https:\/\/buletin.de\/bucuresti\/wp-content\/uploads\/2026\/01\/image_2026-01-28_001429206-20x8.png 20w, https:\/\/buletin.de\/bucuresti\/wp-content\/uploads\/2026\/01\/image_2026-01-28_001429206.png 1487w\" sizes=\"(max-width: 1000px) 100vw, 1000px\" \/><figcaption class=\"wp-element-caption\">Proiectul de hot\u0103r\u00e2re prin care este redus num\u0103rul de treceri de pietoni supra\u00een\u0103l\u021bate<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-suprafa\u021ba-de-interven\u021bie-mai-mica-buget-mai-mare-costurile-se-ridica-la-85-de-milioane-de-euro\">Suprafa\u021b\u0103 de interven\u021bie mai mic\u0103, buget mai mare. Costurile se ridic\u0103 la 85 de milioane de euro <\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Noul proiect de hot\u0103r\u00e2re ini\u0163iat de primarul Robert Negoi\u0163\u0103 vizeaz\u0103 <mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">doar 735 de treceri de pietoni \u0219i intersec\u021bii<\/mark>, deci cu peste 1.000 de obiective de investi\u021bii mai pu\u021bin fa\u021b\u0103 de hot\u0103r\u00e2rile propuse pentru abrogare.<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u0218i \u00een acest caz, obiectivele de investi\u021bii au fost \u00eencadrate \u00een trei categorii:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Treceri de pietoni simple &#8211; 530<\/li>\n\n\n\n<li>Intersec\u0163ii de tip T &#8211; 139<\/li>\n\n\n\n<li>Intersec\u0163ii de tip X &#8211; 66<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">De\u015fi num\u0103rul trecerilor de pietoni propuse pentru supra\u00een\u0103l\u0163are a fost redus drastic, valoarea total\u0103 estimat\u0103 a investi\u0163iei a crescut la <strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">circa 85 de milioane de euro<\/mark><\/strong> (TVA inclus), se precizeaz\u0103 \u00een documentul consultat de <strong>Buletin de Bucure\u015fti.<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u00cen februarie 2025, Marius Popescu sus\u021binea c\u0103 valoarea total\u0103 a proiectelor se ridic\u0103 la &nbsp; 328 milioane lei, adic\u0103 <strong>aproximativ&nbsp;65 milioane euro<\/strong>.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-cum-motiveaza-primaria-sectorului-3-schimbarile-din-proiectul-pentru-treceri-de-pietoni\">Cum motiveaz\u0103 Prim\u0103ria Sectorului 3 schimb\u0103rile din proiectul pentru treceri de pietoni<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Adoptarea unui singur proiect de hot\u0103r\u00e2re care s\u0103 vizeze supra\u00een\u0103l\u021barea trecerilor de pietoni din Sectorul 3 (comparativ cu cele 29 adoptate anterior) ar fi necesar\u0103 pentru ob\u021binerea finan\u021b\u0103rii. Mai precis, atingerea pragului minim de 500.000 de euro impus prin Ghidul Solicitantului. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u00cen documentul consultat de <strong>Buletin de Bucure\u0219ti<\/strong>, Prim\u0103ria Sectorului 3 invoc\u0103 \u201eargumente stringente de natur\u0103 financiar\u0103, administrativ\u0103 \u0219i strategic\u0103 \u201d, \u00eens\u0103 <strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">nu include nicio explica\u021bie privind discordan\u021bele dintre num\u0103rul de treceri \u0219i intersec\u021bii propuse pentru supra\u00een\u0103l\u021bare.<\/mark><\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1000\" height=\"515\" src=\"data:image\/gif;base64,R0lGODlhAQABAAAAACH5BAEKAAEALAAAAAABAAEAAAICTAEAOw==\" data-src=\"https:\/\/buletin.de\/bucuresti\/wp-content\/uploads\/2026\/01\/Cum-motiveaza-PS3--1000x515.png\" alt=\"treceri de pietoni\" class=\"wp-image-169804 lazyload\" data-sizes=\"auto\" data-srcset=\"https:\/\/buletin.de\/bucuresti\/wp-content\/uploads\/2026\/01\/Cum-motiveaza-PS3--1000x515.png 1000w, https:\/\/buletin.de\/bucuresti\/wp-content\/uploads\/2026\/01\/Cum-motiveaza-PS3--300x154.png 300w, https:\/\/buletin.de\/bucuresti\/wp-content\/uploads\/2026\/01\/Cum-motiveaza-PS3--768x395.png 768w, https:\/\/buletin.de\/bucuresti\/wp-content\/uploads\/2026\/01\/Cum-motiveaza-PS3--1100x566.png 1100w, https:\/\/buletin.de\/bucuresti\/wp-content\/uploads\/2026\/01\/Cum-motiveaza-PS3--600x309.png 600w, https:\/\/buletin.de\/bucuresti\/wp-content\/uploads\/2026\/01\/Cum-motiveaza-PS3--20x10.png 20w, https:\/\/buletin.de\/bucuresti\/wp-content\/uploads\/2026\/01\/Cum-motiveaza-PS3-.png 1168w\" sizes=\"(max-width: 1000px) 100vw, 1000px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Totodat\u0103, apelul de proiecte&nbsp;este de tip competitiv, vizeaz\u0103 cre\u0219terea siguran\u021bei rutiere \u0219i are o alocare financiar\u0103 de&nbsp;<strong>31, 2 milioane euro&nbsp;<\/strong>(fonduri europene \u0219i de la bugetul de stat). <\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">Adic\u0103 cu 38 de milioane de euro mai pu\u021bin dec\u00e2t valoarea cheltuielilor eligibile estimate de Prim\u0103ria Sectorului 3.<\/mark><\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u00cen acest context, proiectul ar urma s\u0103 r\u0103m\u00e2n\u0103<strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\"> \u201e\u00een rezerv\u0103\u201d <\/mark><\/strong>p\u00e2n\u0103 la identificarea surselor de finan\u021bare, se mai men\u021bioneaz\u0103 \u00een Ghidul Solicitantului.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"780\" height=\"256\" src=\"data:image\/gif;base64,R0lGODlhAQABAAAAACH5BAEKAAEALAAAAAABAAEAAAICTAEAOw==\" data-src=\"https:\/\/buletin.de\/bucuresti\/wp-content\/uploads\/2026\/01\/9cb3a74b-6779-406e-81f7-d02fbe787fed.jpeg\" alt=\"\" class=\"wp-image-169805 lazyload\" data-sizes=\"auto\" data-srcset=\"https:\/\/buletin.de\/bucuresti\/wp-content\/uploads\/2026\/01\/9cb3a74b-6779-406e-81f7-d02fbe787fed.jpeg 780w, https:\/\/buletin.de\/bucuresti\/wp-content\/uploads\/2026\/01\/9cb3a74b-6779-406e-81f7-d02fbe787fed-300x98.jpeg 300w, https:\/\/buletin.de\/bucuresti\/wp-content\/uploads\/2026\/01\/9cb3a74b-6779-406e-81f7-d02fbe787fed-768x252.jpeg 768w, https:\/\/buletin.de\/bucuresti\/wp-content\/uploads\/2026\/01\/9cb3a74b-6779-406e-81f7-d02fbe787fed-600x197.jpeg 600w, https:\/\/buletin.de\/bucuresti\/wp-content\/uploads\/2026\/01\/9cb3a74b-6779-406e-81f7-d02fbe787fed-20x7.jpeg 20w\" sizes=\"(max-width: 780px) 100vw, 780px\" \/><figcaption class=\"wp-element-caption\">Foto: Captur\u0103 de ecran\/ Ghidul Solicitantului &#8211; Apel de proiecte PR BI P5<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-robert-negoi\u021ba-atac-la-adresa-bdb-nu-face\u021bi-jurnalism\">Robert Negoi\u021b\u0103, atac la adresa BdB: \u201eNu face\u021bi jurnalism\u201d<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Reporterii Buletin de Bucure\u0219ti l-au contactat \u0219i pe primarul Robert Negoi\u021b\u0103 pentru un punct de vedere \u0219i clarific\u0103ri privind reducerea num\u0103rului de treceri de pietoni propuse pentru supra\u00een\u0103l\u021bare, \u00eens\u0103 edilul Sectorului 3 a refuzat orice discu\u021bie, acuz\u00e2nd redac\u021bia de rea inten\u021bie.<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201eNu m\u0103 intereseaz\u0103 s\u0103 v\u0103 dau (n.r. declara\u021bii), c\u0103 sunte\u021bi r\u0103u inten\u021biona\u021bi \u0219i nu face\u021bi jurnalism, face\u021bi partizanat, face\u021bi altceva\u201d, a declarat Robert Negoi\u021b\u0103 \u00eenainte de a \u00eenchide telefonul reporterilor BdB.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>CITE\u0218TE \u0218I: <a href=\"https:\/\/buletin.de\/bucuresti\/atac-la-buletin-de-bucuresti-dupa-investigatia-circuitul-negoita\/\">Primarul Sectorului 3, atac la Buletin de Bucure\u0219ti dup\u0103 investiga\u021bia \u201eCircuitul Negoi\u021b\u0103\u201d: \u201eO publica\u021bie de rea-credin\u021b\u0103. (\u2026) Doar cine nu a f\u0103cut nimic \u00een via\u021b\u0103 nu poate s\u0103 \u00een\u021beleag\u0103!\u201d<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Update 28 ianuarie: Proiectul a fost adoptat cu 19 voturi pentru \u0219i 10 ab\u021bineri, dup\u0103 aproximativ 30 de minute de dezbateri, \u00een care opozi\u021bia a pus sub semnul \u00eentreb\u0103rii oportunitatea investi\u021biei, invoc\u00e2nd risipa banului public pe studii de fezabilitate r\u0103mase \u00een sertarele Prim\u0103riei Sectorului 3. CITE\u0218TE \u0218I: Sector 3 | 115.000 de euro pentru supra\u00een\u0103l\u021barea [&hellip;]<\/p>\n","protected":false},"author":55,"featured_media":169809,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"ngg_post_thumbnail":0,"footnotes":""},"categories":[6994,3419,24],"tags":[3174,440,4673,26073],"ppma_author":[22573],"class_list":["post-169695","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-stiri-2","category-featured","category-primarie","tag-primaria-sectorului-3","tag-sector-3","tag-treceri-de-pietoni","tag-treceri-suprainaltate"],"acf":[],"a3_pvc":{"activated":false,"total_views":0,"today_views":0},"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.0 (Yoast SEO v28.1) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Prim\u0103ria Sectorului 3 renun\u021b\u0103 la 1.000 de treceri de pietoni din proiectul de supra\u00een\u0103l\u021bare, dar costurile cresc la 85 de milioane de euro - Buletin de Bucure\u0219ti<\/title>\n<meta name=\"description\" content=\"Prim\u0103ria Sectorului 3 renun\u021b\u0103 la supra\u00een\u0103l\u021barea a peste 1.000 de treceri de pietoni, dar costurile cresc la 85 de milioane de euro.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/buletin.de\/bucuresti\/primaria-sectorului-3-taie-1-000-de-treceri-de-pietoni-din-proiectul-de-suprainaltare-dar-costurile-cresc-la-85-de-milioane-de-euro\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Prim\u0103ria Sectorului 3 renun\u021b\u0103 la 1.000 de treceri de pietoni din proiectul de supra\u00een\u0103l\u021bare, dar costurile cresc la 85 de milioane de euro\" \/>\n<meta property=\"og:description\" content=\"Prim\u0103ria Sectorului 3 renun\u021b\u0103 la supra\u00een\u0103l\u021barea a peste 1.000 de treceri de pietoni, dar costurile cresc la 85 de milioane de euro.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/buletin.de\/bucuresti\/primaria-sectorului-3-taie-1-000-de-treceri-de-pietoni-din-proiectul-de-suprainaltare-dar-costurile-cresc-la-85-de-milioane-de-euro\/\" \/>\n<meta property=\"og:site_name\" content=\"Buletin de Bucure\u0219ti\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/buletin.de.buc\" \/>\n<meta property=\"article:published_time\" content=\"2026-01-27T23:33:21+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-01-28T16:34:22+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/buletin.de\/bucuresti\/wp-content\/uploads\/2026\/01\/469903347_906527814988257_10915012695902038_n-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1280\" \/>\n\t<meta property=\"og:image:height\" content=\"720\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Andreea Tudor\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Andreea Tudor\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"6 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/primaria-sectorului-3-taie-1-000-de-treceri-de-pietoni-din-proiectul-de-suprainaltare-dar-costurile-cresc-la-85-de-milioane-de-euro\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/primaria-sectorului-3-taie-1-000-de-treceri-de-pietoni-din-proiectul-de-suprainaltare-dar-costurile-cresc-la-85-de-milioane-de-euro\\\/\"},\"author\":{\"name\":\"Andreea Tudor\",\"@id\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/#\\\/schema\\\/person\\\/150590659efde715459d159da012f501\"},\"headline\":\"Prim\u0103ria Sectorului 3 renun\u021b\u0103 la 1.000 de treceri de pietoni din proiectul de supra\u00een\u0103l\u021bare, dar costurile cresc la 85 de milioane de euro\",\"datePublished\":\"2026-01-27T23:33:21+00:00\",\"dateModified\":\"2026-01-28T16:34:22+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/primaria-sectorului-3-taie-1-000-de-treceri-de-pietoni-din-proiectul-de-suprainaltare-dar-costurile-cresc-la-85-de-milioane-de-euro\\\/\"},\"wordCount\":1096,\"publisher\":{\"@id\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/primaria-sectorului-3-taie-1-000-de-treceri-de-pietoni-din-proiectul-de-suprainaltare-dar-costurile-cresc-la-85-de-milioane-de-euro\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/wp-content\\\/uploads\\\/2026\\\/01\\\/469903347_906527814988257_10915012695902038_n-1.jpg\",\"keywords\":[\"primaria sectorului 3\",\"Sector 3\",\"treceri de pietoni\",\"treceri suprainaltate\"],\"articleSection\":[\"Articole\",\"Featured\",\"Prim\u0103rie\"],\"inLanguage\":\"en-GB\",\"copyrightYear\":\"2026\",\"copyrightHolder\":{\"@id\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/#organization\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/primaria-sectorului-3-taie-1-000-de-treceri-de-pietoni-din-proiectul-de-suprainaltare-dar-costurile-cresc-la-85-de-milioane-de-euro\\\/\",\"url\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/primaria-sectorului-3-taie-1-000-de-treceri-de-pietoni-din-proiectul-de-suprainaltare-dar-costurile-cresc-la-85-de-milioane-de-euro\\\/\",\"name\":\"Prim\u0103ria Sectorului 3 renun\u021b\u0103 la 1.000 de treceri de pietoni din proiectul de supra\u00een\u0103l\u021bare, dar costurile cresc la 85 de milioane de euro - Buletin de Bucure\u0219ti\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/primaria-sectorului-3-taie-1-000-de-treceri-de-pietoni-din-proiectul-de-suprainaltare-dar-costurile-cresc-la-85-de-milioane-de-euro\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/primaria-sectorului-3-taie-1-000-de-treceri-de-pietoni-din-proiectul-de-suprainaltare-dar-costurile-cresc-la-85-de-milioane-de-euro\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/wp-content\\\/uploads\\\/2026\\\/01\\\/469903347_906527814988257_10915012695902038_n-1.jpg\",\"datePublished\":\"2026-01-27T23:33:21+00:00\",\"dateModified\":\"2026-01-28T16:34:22+00:00\",\"description\":\"Prim\u0103ria Sectorului 3 renun\u021b\u0103 la supra\u00een\u0103l\u021barea a peste 1.000 de treceri de pietoni, dar costurile cresc la 85 de milioane de euro.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/primaria-sectorului-3-taie-1-000-de-treceri-de-pietoni-din-proiectul-de-suprainaltare-dar-costurile-cresc-la-85-de-milioane-de-euro\\\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/primaria-sectorului-3-taie-1-000-de-treceri-de-pietoni-din-proiectul-de-suprainaltare-dar-costurile-cresc-la-85-de-milioane-de-euro\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/primaria-sectorului-3-taie-1-000-de-treceri-de-pietoni-din-proiectul-de-suprainaltare-dar-costurile-cresc-la-85-de-milioane-de-euro\\\/#primaryimage\",\"url\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/wp-content\\\/uploads\\\/2026\\\/01\\\/469903347_906527814988257_10915012695902038_n-1.jpg\",\"contentUrl\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/wp-content\\\/uploads\\\/2026\\\/01\\\/469903347_906527814988257_10915012695902038_n-1.jpg\",\"width\":1280,\"height\":720,\"caption\":\"PS3 renun\u021b\u0103 la supra\u00een\u0103l\u021barea a peste 1.000 de treceri de pietoni, dar costurile cresc la 85 de milioane de euro. Exemplu de treceri de pietoni supra\u00een\u0103l\u021bate. Foto: PMB\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/primaria-sectorului-3-taie-1-000-de-treceri-de-pietoni-din-proiectul-de-suprainaltare-dar-costurile-cresc-la-85-de-milioane-de-euro\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Acas\u0103\",\"item\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Prim\u0103ria Sectorului 3 renun\u021b\u0103 la 1.000 de treceri de pietoni din proiectul de supra\u00een\u0103l\u021bare, dar costurile cresc la 85 de milioane de euro\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/#website\",\"url\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/\",\"name\":\"Buletin de Bucure\u0219ti\",\"description\":\"\u0218tiri \u0219i investiga\u021bii esen\u021biale din capital\u0103\",\"publisher\":{\"@id\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/#organization\",\"name\":\"Buletin de Bucure\u0219ti\",\"url\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/wp-content\\\/uploads\\\/logo-bdb-full-wide-vernil-transparent.png\",\"contentUrl\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/wp-content\\\/uploads\\\/logo-bdb-full-wide-vernil-transparent.png\",\"width\":1782,\"height\":626,\"caption\":\"Buletin de Bucure\u0219ti\"},\"image\":{\"@id\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/buletin.de.buc\",\"https:\\\/\\\/www.instagram.com\\\/buletinde.bucuresti\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/#\\\/schema\\\/person\\\/150590659efde715459d159da012f501\",\"name\":\"Andreea Tudor\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/BDB_Andreea_T-5-96x96.jpg2291f994b0ece9443cb8e95c805b8b20\",\"url\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/BDB_Andreea_T-5-96x96.jpg\",\"contentUrl\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/BDB_Andreea_T-5-96x96.jpg\",\"caption\":\"Andreea Tudor\"},\"description\":\"Reporter la Buletin de Bucure\u0219ti de doi ani \u0219i jum\u0103tate. Sus\u021bin\u0103toare a presei independente, pasionat\u0103 de subiectele de mediu.\",\"url\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/author\\\/andreeatudor\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Prim\u0103ria Sectorului 3 renun\u021b\u0103 la 1.000 de treceri de pietoni din proiectul de supra\u00een\u0103l\u021bare, dar costurile cresc la 85 de milioane de euro - Buletin de Bucure\u0219ti","description":"Prim\u0103ria Sectorului 3 renun\u021b\u0103 la supra\u00een\u0103l\u021barea a peste 1.000 de treceri de pietoni, dar costurile cresc la 85 de milioane de euro.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/buletin.de\/bucuresti\/primaria-sectorului-3-taie-1-000-de-treceri-de-pietoni-din-proiectul-de-suprainaltare-dar-costurile-cresc-la-85-de-milioane-de-euro\/","og_locale":"en_GB","og_type":"article","og_title":"Prim\u0103ria Sectorului 3 renun\u021b\u0103 la 1.000 de treceri de pietoni din proiectul de supra\u00een\u0103l\u021bare, dar costurile cresc la 85 de milioane de euro","og_description":"Prim\u0103ria Sectorului 3 renun\u021b\u0103 la supra\u00een\u0103l\u021barea a peste 1.000 de treceri de pietoni, dar costurile cresc la 85 de milioane de euro.","og_url":"https:\/\/buletin.de\/bucuresti\/primaria-sectorului-3-taie-1-000-de-treceri-de-pietoni-din-proiectul-de-suprainaltare-dar-costurile-cresc-la-85-de-milioane-de-euro\/","og_site_name":"Buletin de Bucure\u0219ti","article_publisher":"https:\/\/www.facebook.com\/buletin.de.buc","article_published_time":"2026-01-27T23:33:21+00:00","article_modified_time":"2026-01-28T16:34:22+00:00","og_image":[{"width":1280,"height":720,"url":"https:\/\/buletin.de\/bucuresti\/wp-content\/uploads\/2026\/01\/469903347_906527814988257_10915012695902038_n-1.jpg","type":"image\/jpeg"}],"author":"Andreea Tudor","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Andreea Tudor","Estimated reading time":"6 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/buletin.de\/bucuresti\/primaria-sectorului-3-taie-1-000-de-treceri-de-pietoni-din-proiectul-de-suprainaltare-dar-costurile-cresc-la-85-de-milioane-de-euro\/#article","isPartOf":{"@id":"https:\/\/buletin.de\/bucuresti\/primaria-sectorului-3-taie-1-000-de-treceri-de-pietoni-din-proiectul-de-suprainaltare-dar-costurile-cresc-la-85-de-milioane-de-euro\/"},"author":{"name":"Andreea Tudor","@id":"https:\/\/buletin.de\/bucuresti\/#\/schema\/person\/150590659efde715459d159da012f501"},"headline":"Prim\u0103ria Sectorului 3 renun\u021b\u0103 la 1.000 de treceri de pietoni din proiectul de supra\u00een\u0103l\u021bare, dar costurile cresc la 85 de milioane de euro","datePublished":"2026-01-27T23:33:21+00:00","dateModified":"2026-01-28T16:34:22+00:00","mainEntityOfPage":{"@id":"https:\/\/buletin.de\/bucuresti\/primaria-sectorului-3-taie-1-000-de-treceri-de-pietoni-din-proiectul-de-suprainaltare-dar-costurile-cresc-la-85-de-milioane-de-euro\/"},"wordCount":1096,"publisher":{"@id":"https:\/\/buletin.de\/bucuresti\/#organization"},"image":{"@id":"https:\/\/buletin.de\/bucuresti\/primaria-sectorului-3-taie-1-000-de-treceri-de-pietoni-din-proiectul-de-suprainaltare-dar-costurile-cresc-la-85-de-milioane-de-euro\/#primaryimage"},"thumbnailUrl":"https:\/\/buletin.de\/bucuresti\/wp-content\/uploads\/2026\/01\/469903347_906527814988257_10915012695902038_n-1.jpg","keywords":["primaria sectorului 3","Sector 3","treceri de pietoni","treceri suprainaltate"],"articleSection":["Articole","Featured","Prim\u0103rie"],"inLanguage":"en-GB","copyrightYear":"2026","copyrightHolder":{"@id":"https:\/\/buletin.de\/bucuresti\/#organization"}},{"@type":"WebPage","@id":"https:\/\/buletin.de\/bucuresti\/primaria-sectorului-3-taie-1-000-de-treceri-de-pietoni-din-proiectul-de-suprainaltare-dar-costurile-cresc-la-85-de-milioane-de-euro\/","url":"https:\/\/buletin.de\/bucuresti\/primaria-sectorului-3-taie-1-000-de-treceri-de-pietoni-din-proiectul-de-suprainaltare-dar-costurile-cresc-la-85-de-milioane-de-euro\/","name":"Prim\u0103ria Sectorului 3 renun\u021b\u0103 la 1.000 de treceri de pietoni din proiectul de supra\u00een\u0103l\u021bare, dar costurile cresc la 85 de milioane de euro - Buletin de Bucure\u0219ti","isPartOf":{"@id":"https:\/\/buletin.de\/bucuresti\/#website"},"primaryImageOfPage":{"@id":"https:\/\/buletin.de\/bucuresti\/primaria-sectorului-3-taie-1-000-de-treceri-de-pietoni-din-proiectul-de-suprainaltare-dar-costurile-cresc-la-85-de-milioane-de-euro\/#primaryimage"},"image":{"@id":"https:\/\/buletin.de\/bucuresti\/primaria-sectorului-3-taie-1-000-de-treceri-de-pietoni-din-proiectul-de-suprainaltare-dar-costurile-cresc-la-85-de-milioane-de-euro\/#primaryimage"},"thumbnailUrl":"https:\/\/buletin.de\/bucuresti\/wp-content\/uploads\/2026\/01\/469903347_906527814988257_10915012695902038_n-1.jpg","datePublished":"2026-01-27T23:33:21+00:00","dateModified":"2026-01-28T16:34:22+00:00","description":"Prim\u0103ria Sectorului 3 renun\u021b\u0103 la supra\u00een\u0103l\u021barea a peste 1.000 de treceri de pietoni, dar costurile cresc la 85 de milioane de euro.","breadcrumb":{"@id":"https:\/\/buletin.de\/bucuresti\/primaria-sectorului-3-taie-1-000-de-treceri-de-pietoni-din-proiectul-de-suprainaltare-dar-costurile-cresc-la-85-de-milioane-de-euro\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/buletin.de\/bucuresti\/primaria-sectorului-3-taie-1-000-de-treceri-de-pietoni-din-proiectul-de-suprainaltare-dar-costurile-cresc-la-85-de-milioane-de-euro\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/buletin.de\/bucuresti\/primaria-sectorului-3-taie-1-000-de-treceri-de-pietoni-din-proiectul-de-suprainaltare-dar-costurile-cresc-la-85-de-milioane-de-euro\/#primaryimage","url":"https:\/\/buletin.de\/bucuresti\/wp-content\/uploads\/2026\/01\/469903347_906527814988257_10915012695902038_n-1.jpg","contentUrl":"https:\/\/buletin.de\/bucuresti\/wp-content\/uploads\/2026\/01\/469903347_906527814988257_10915012695902038_n-1.jpg","width":1280,"height":720,"caption":"PS3 renun\u021b\u0103 la supra\u00een\u0103l\u021barea a peste 1.000 de treceri de pietoni, dar costurile cresc la 85 de milioane de euro. Exemplu de treceri de pietoni supra\u00een\u0103l\u021bate. Foto: PMB"},{"@type":"BreadcrumbList","@id":"https:\/\/buletin.de\/bucuresti\/primaria-sectorului-3-taie-1-000-de-treceri-de-pietoni-din-proiectul-de-suprainaltare-dar-costurile-cresc-la-85-de-milioane-de-euro\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Acas\u0103","item":"https:\/\/buletin.de\/bucuresti\/"},{"@type":"ListItem","position":2,"name":"Prim\u0103ria Sectorului 3 renun\u021b\u0103 la 1.000 de treceri de pietoni din proiectul de supra\u00een\u0103l\u021bare, dar costurile cresc la 85 de milioane de euro"}]},{"@type":"WebSite","@id":"https:\/\/buletin.de\/bucuresti\/#website","url":"https:\/\/buletin.de\/bucuresti\/","name":"Buletin de Bucure\u0219ti","description":"\u0218tiri \u0219i investiga\u021bii esen\u021biale din capital\u0103","publisher":{"@id":"https:\/\/buletin.de\/bucuresti\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/buletin.de\/bucuresti\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Organization","@id":"https:\/\/buletin.de\/bucuresti\/#organization","name":"Buletin de Bucure\u0219ti","url":"https:\/\/buletin.de\/bucuresti\/","logo":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/buletin.de\/bucuresti\/#\/schema\/logo\/image\/","url":"https:\/\/buletin.de\/bucuresti\/wp-content\/uploads\/logo-bdb-full-wide-vernil-transparent.png","contentUrl":"https:\/\/buletin.de\/bucuresti\/wp-content\/uploads\/logo-bdb-full-wide-vernil-transparent.png","width":1782,"height":626,"caption":"Buletin de Bucure\u0219ti"},"image":{"@id":"https:\/\/buletin.de\/bucuresti\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/buletin.de.buc","https:\/\/www.instagram.com\/buletinde.bucuresti\/"]},{"@type":"Person","@id":"https:\/\/buletin.de\/bucuresti\/#\/schema\/person\/150590659efde715459d159da012f501","name":"Andreea Tudor","image":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/buletin.de\/bucuresti\/wp-content\/uploads\/2026\/06\/BDB_Andreea_T-5-96x96.jpg2291f994b0ece9443cb8e95c805b8b20","url":"https:\/\/buletin.de\/bucuresti\/wp-content\/uploads\/2026\/06\/BDB_Andreea_T-5-96x96.jpg","contentUrl":"https:\/\/buletin.de\/bucuresti\/wp-content\/uploads\/2026\/06\/BDB_Andreea_T-5-96x96.jpg","caption":"Andreea Tudor"},"description":"Reporter la Buletin de Bucure\u0219ti de doi ani \u0219i jum\u0103tate. Sus\u021bin\u0103toare a presei independente, pasionat\u0103 de subiectele de mediu.","url":"https:\/\/buletin.de\/bucuresti\/author\/andreeatudor\/"}]}},"authors":[{"term_id":22573,"user_id":55,"is_guest":0,"slug":"andreeatudor","display_name":"Andreea Tudor","avatar_url":"https:\/\/buletin.de\/bucuresti\/wp-content\/uploads\/2026\/06\/BDB_Andreea_T-5-96x96.jpg","author_category":"","first_name":"Andreea","last_name":"Tudor","user_url":"","job_title":"","description":"Reporter la Buletin de Bucure\u0219ti de doi ani \u0219i jum\u0103tate. Sus\u021bin\u0103toare a presei independente, pasionat\u0103 de subiectele de mediu."}],"_links":{"self":[{"href":"https:\/\/buletin.de\/bucuresti\/wp-json\/wp\/v2\/posts\/169695","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/buletin.de\/bucuresti\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/buletin.de\/bucuresti\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/buletin.de\/bucuresti\/wp-json\/wp\/v2\/users\/55"}],"replies":[{"embeddable":true,"href":"https:\/\/buletin.de\/bucuresti\/wp-json\/wp\/v2\/comments?post=169695"}],"version-history":[{"count":26,"href":"https:\/\/buletin.de\/bucuresti\/wp-json\/wp\/v2\/posts\/169695\/revisions"}],"predecessor-version":[{"id":170052,"href":"https:\/\/buletin.de\/bucuresti\/wp-json\/wp\/v2\/posts\/169695\/revisions\/170052"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/buletin.de\/bucuresti\/wp-json\/wp\/v2\/media\/169809"}],"wp:attachment":[{"href":"https:\/\/buletin.de\/bucuresti\/wp-json\/wp\/v2\/media?parent=169695"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/buletin.de\/bucuresti\/wp-json\/wp\/v2\/categories?post=169695"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/buletin.de\/bucuresti\/wp-json\/wp\/v2\/tags?post=169695"},{"taxonomy":"author","embeddable":true,"href":"https:\/\/buletin.de\/bucuresti\/wp-json\/wp\/v2\/ppma_author?post=169695"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}