{"id":122356,"date":"2025-03-12T16:23:36","date_gmt":"2025-03-12T13:23:36","guid":{"rendered":"https:\/\/buletin.de\/bucuresti\/?p=122356"},"modified":"2025-03-12T16:34:11","modified_gmt":"2025-03-12T13:34:11","slug":"grecii-de-pe-lotul-3-al-a0-sud-mai-optimisti-decat-ministerul-transporturilor-promit-ca-termina-santierul-in-aprilie","status":"publish","type":"post","link":"https:\/\/buletin.de\/bucuresti\/grecii-de-pe-lotul-3-al-a0-sud-mai-optimisti-decat-ministerul-transporturilor-promit-ca-termina-santierul-in-aprilie\/","title":{"rendered":"Grecii de pe lotul 3 al A0 Sud, mai optimi\u0219ti dec\u00e2t Ministerul Transporturilor: promit c\u0103 termin\u0103 \u0219antierul \u00een aprilie"},"content":{"rendered":"\n<p><strong>Constructorul grec care lucreaz\u0103 pe lotul 3 al A0 Sud, autostrada de centur\u0103 a Bucure\u0219tiului, afirm\u0103 c\u0103 \u00eel poate da \u00een circula\u021bie p\u00e2n\u0103 la finalul lui aprilie. Ministerul Transporturilor crede c\u0103 lucr\u0103rile nu se pot \u00eencheia mai devreme de iulie. <\/strong><\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-tronsonul-ar-fi-gata-in-propor\u021bie-de-92\">Tronsonul ar fi gata \u00een propor\u021bie de 92%<\/h2>\n\n\n\n<p><strong>Lotul 3 al A0 Sud, autostrada de centur\u0103, ar putea fi dat \u00een folosin\u0163\u0103 la sf\u00e2r\u015fitul lunii aprilie, \u00een condi\u021biile \u00een care acesta se afl\u0103 la un stadiu de execu\u0163ie fizic \u00een \u015fantier de peste 92%, a anun\u0163at, mar\u0163i, constructorul grec AKTOR, citat de <a href=\"https:\/\/agerpres.ro\/\" target=\"_blank\" rel=\"noreferrer noopener\">Agerpres<\/a>.<\/strong><\/p>\n\n\n\n<p>AKTOR a precizat c\u0103 a finalizat instalarea grinzilor la pasajul \u0162eghe\u015f, un punct critic \u00een avansarea lucr\u0103rilor, care trece pe deasupra autostr\u0103zii \u015fi asigur\u0103 continuitatea Drumului Comunal 125 (DC125), contribuind semnificativ la fluidizarea traficului \u00een zona metropolitan\u0103 bucure\u015ftean\u0103 \u015fi facilit\u00e2nd conexiunea dintre localit\u0103\u0163ile adiacente.<\/p>\n\n\n\n<p>\u201eExcept\u00e2nd vremea nefavorabil\u0103 din februarie, construc\u0163ia <strong>pasajului \u0162eghe\u015f a \u00eent\u00e2mpinat alte obstacole tehnice care au influen\u0163at ritmul de execu\u0163ie. <\/strong><\/p>\n\n\n\n<p>Cel mai mare a fost relocarea unei conducte de gaz care traversa zona, \u00eempiedic\u00e2nd realizarea complet\u0103 a forajelor pentru pilonii pasajului. <\/p>\n\n\n\n<p>Cu aceast\u0103 etap\u0103 \u00eencheiat\u0103, urmeaz\u0103 finalizarea mont\u0103rii echipamentelor ITS (Intelligent Transportation Systems), a parape\u0163ilor metalici \u015fi a marcajelor verticale \u015fi orizontale. <\/p>\n\n\n\n<p><strong>Aproximativ 70% din parape\u0163i, sisteme ITS, garduri de \u00eemprejmuire \u015fi consolele pentru marcaje verticale au fost instalate.<\/strong> Au fost monta\u0163i aproximativ 500 de st\u00e2lpi de iluminat din totalul de 620 prev\u0103zu\u0163i \u00een proiect urm\u00e2nd ca \u00een urm\u0103toarele 30 zile s\u0103 fie montate l\u0103mpile\u201d, precizeaz\u0103 constructorul grec, \u00eentr-un comunicat.<\/p>\n\n\n\n<p>Conform acestuia, din totalul de 260.000 tone asfalt au mai r\u0103mas 36.000 tone de uzur\u0103, care vor fi a\u015fternute \u015fi finalizate \u00een urm\u0103toarele 26 de zile conform programului de lucru, iar toate structurile majore, inclusiv poduri \u015fi pasaje, sunt complet func\u0163ionale.<\/p>\n\n\n\n<p><strong>CITE\u0218TE \u0218I: <a href=\"https:\/\/buletin.de\/bucuresti\/autostrada-bucuresti-chinezii-l-au-intrecut-pe-umbrarescu-avans-considerabil-pe-lotul-dintre-afumati-pantelimon-fata-de-viaductul-cernica\/\" target=\"_blank\" rel=\"noreferrer noopener\">Autostrada Bucure\u0219ti | Chinezii l-au \u00eentrecut pe Umbr\u0103rescu. Avans considerabil pe lotul dintre Afuma\u021bi-Pantelimon fa\u021b\u0103 de viaductul Cernica<\/a><\/strong><\/p>\n\n\n\n<div class=\"wp-block-buttons is-content-justification-center is-layout-flex wp-container-core-buttons-is-layout-16018d1d wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button has-custom-width wp-block-button__width-100\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/www.patreon.com\/BuletinDeBucuresti\"><strong>Sus\u021bine Buletin de Bucure\u0219ti pentru investiga\u021bii, reportaje \u0219i \u0219tiri Locale<\/strong><\/a><\/div>\n<\/div>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-lotul-3-al-a0-sud-intarziat-deja-aproape-trei-ani\">Lotul 3 al A0 Sud, \u00eent\u00e2rziat deja aproape trei ani<\/h2>\n\n\n\n<p><strong>S\u0103pt\u0103m\u00e2na trecut\u0103, Ministerul Transporturilor comunica faptul c\u0103 lotul 3 al A0 Sud, care face leg\u0103tura \u00eentre A1 \u0219i A2, prin sudul Capitalei, nu va fi gata p\u00e2n\u0103 la 15 aprilie, cum a anun\u021bat ini\u021bial constructorul grec.<\/strong> De altfel, Aktor avansase un nou termen, luna iulie.<\/p>\n\n\n\n<p>Tronsonul are 18 kilometri \u0219i se \u00eentinde \u00eentre localit\u0103\u021bile Joi\u021ba \u0219i Bragadiru \u0219i va permite, c\u00e2nd vor fi gata, legatur\u0103 continu\u0103, pe autostrad\u0103, dinspre Pite\u0219ti \u0219i Constan\u021ba, dar \u0219i \u00eentre Craiova \u0219i Constan\u021ba. <\/p>\n\n\n\n<p>Ulterior, o dat\u0103 cu finalizarea segmentului lips\u0103 de pe A1, Sibiu-Pite\u0219ti, se va putea face conexiunea direct\u0103, exclusiv pe drum de mare viteaz\u0103, Constan\u021ba-N\u0103dlac.<\/p>\n\n\n\n<p>\u201e<strong>Nu suntem siguri c\u0103 se va respecta \u0219i acest termen<\/strong> (15 aprilie &#8211; n.r.). Ne uit\u0103m \u0219i pe procesul lor fizic \u00een ultimele trei luni au ajuns de la 76% la 78%. Mai au 22% din contract. Sunt deja penaliza\u021bi cu 5 milioane de lei, vor fi penaliza\u021bi \u00een continuare. <\/p>\n\n\n\n<p>Vor ajunge la finalul acestui contract s\u0103 pl\u0103teasc\u0103 cel pu\u021bin 15% din valoarea contractului\u201d, a declarat purt\u0103torul de cuv\u00e2nt al CNAIR, Alin \u0218erb\u0103nescu, citat de Digi24.<\/p>\n\n\n\n<p><strong>CITE\u0218TE \u0218I: <a href=\"https:\/\/buletin.de\/bucuresti\/video-lotul-din-autostrada-de-centura-care-face-legatura-intre-a1-si-a2-nu-este-gata-pe-15-aprilie-amanare-de-trei-luni-pe-tronsonul-de-sud\/\" target=\"_blank\" rel=\"noreferrer noopener\">VIDEO | Lotul din Autostrada de Centur\u0103 care face leg\u0103tura \u00eentre A1 \u0219i A2 nu este gata pe 15 aprilie. Am\u00e2nare de trei luni pe tronsonul de sud<br><\/a><\/strong><br>Dac\u0103 lotul ar fi dat \u00een folosin\u021b\u0103 \u00een iulie, s-ar \u00eenregistra <strong>o \u00eent\u00e2rziere de un an \u0219i opt luni, care se adaug\u0103 la anul pierdut \u00eenc\u0103 din etapa de proiectare.<\/strong><\/p>\n\n\n\n<p>\u00cen aceste condi\u021bii, Compania Na\u021bional\u0103 de Administrare a Infrastructurii Rutiere (CNAIR) a avertizat c\u0103 va impune penaliz\u0103ri pentru AKTOR.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-repliere-a-constructorului-grec-promit-ca-termina-in-aprilie\">Repliere a constructorului grec: promit c\u0103 termin\u0103 \u00een aprilie<\/h2>\n\n\n\n<p><strong>\u00cen aceste condi\u021bii, constructorul grec a men\u021bionat c\u0103 colaboreaz\u0103 \u00eendeaproape cu autorit\u0103\u0163ile pentru a \u00eencheia toate lucr\u0103rile r\u0103mase \u00een timp util, respectiv \u00een aprilie.<\/strong><\/p>\n\n\n\n<p>Segmentul A0 Sud Lot 3 cuprinde 15,465 km din Centura de Sud \u015fi 2,5 km din Centura de Nord, desp\u0103r\u0163ite de autostrada A1 spre Pite\u015fti, cu un pasaj impresionant peste autostrada A1 \u00een zona Ciorog\u00e2rla. <\/p>\n\n\n\n<p>Proiectul mai include 4 poduri, 6 pasaje (overpass-uri), 9 pasaje pe autostrada, 46 de pode\u0163e, dou\u0103 parc\u0103ri de scurta durata \u015fi dou\u0103 zone de servicii.<\/p>\n\n\n\n<p>De asemenea, proiectul integreaz\u0103 lucr\u0103ri complexe de infrastructur\u0103, precum terasamente, rambleuri, \u00eemprejmuiri, bariere fonoabsorbante, parape\u0163i \u015fi marcaje \u015fi elemente de semnalizare orizontal\u0103 \u015fi vertical\u0103; sisteme moderne de iluminat, sisteme de comunica\u0163ii pentru autostrad\u0103, zone publice de recreere, precum \u015fi zone publice de agrement, lucr\u0103ri de peisagistic\u0103 \u015fi amenajare a terenului pentru \u00eembun\u0103t\u0103\u0163irea mediului \u00eenconjur\u0103tor.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Constructorul grec care lucreaz\u0103 pe lotul 3 al A0 Sud, autostrada de centur\u0103 a Bucure\u0219tiului, afirm\u0103 c\u0103 \u00eel poate da \u00een circula\u021bie p\u00e2n\u0103 la finalul lui aprilie. Ministerul Transporturilor crede c\u0103 lucr\u0103rile nu se pot \u00eencheia mai devreme de iulie. Tronsonul ar fi gata \u00een propor\u021bie de 92% Lotul 3 al A0 Sud, autostrada de [&hellip;]<\/p>\n","protected":false},"author":60,"featured_media":122361,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"ngg_post_thumbnail":0,"footnotes":""},"categories":[6994,5762,650],"tags":[1465,11415,11416,10035,13787,3033],"ppma_author":[22582],"class_list":["post-122356","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-stiri-2","category-main","category-transport","tag-a0","tag-a0-lot-3","tag-a0-lot-3-sud","tag-a0-sud","tag-a0-a2-nod-rutier","tag-aktor"],"acf":[],"a3_pvc":{"activated":false,"total_views":0,"today_views":0},"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.6 (Yoast SEO v27.6) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Grecii de pe lotul 3 al A0 Sud, mai optimi\u0219ti dec\u00e2t Ministerul Transporturilor: promit c\u0103 termin\u0103 \u0219antierul \u00een aprilie - Buletin de Bucure\u0219ti<\/title>\n<meta name=\"description\" content=\"Constructorul grec care lucreaz\u0103 pe lotul 3 al A0 Sud afirm\u0103 c\u0103 \u00eel poate da \u00een circula\u021bie p\u00e2n\u0103 la finalul lui aprilie.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/buletin.de\/bucuresti\/grecii-de-pe-lotul-3-al-a0-sud-mai-optimisti-decat-ministerul-transporturilor-promit-ca-termina-santierul-in-aprilie\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Grecii de pe lotul 3 al A0 Sud, mai optimi\u0219ti dec\u00e2t Ministerul Transporturilor: promit c\u0103 termin\u0103 \u0219antierul \u00een aprilie\" \/>\n<meta property=\"og:description\" content=\"Constructorul grec care lucreaz\u0103 pe lotul 3 al A0 Sud afirm\u0103 c\u0103 \u00eel poate da \u00een circula\u021bie p\u00e2n\u0103 la finalul lui aprilie.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/buletin.de\/bucuresti\/grecii-de-pe-lotul-3-al-a0-sud-mai-optimisti-decat-ministerul-transporturilor-promit-ca-termina-santierul-in-aprilie\/\" \/>\n<meta property=\"og:site_name\" content=\"Buletin de Bucure\u0219ti\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/buletin.de.buc\" \/>\n<meta property=\"article:published_time\" content=\"2025-03-12T13:23:36+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-03-12T13:34:11+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/buletin.de\/bucuresti\/wp-content\/uploads\/2025\/03\/a0sud-e1741785767750.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1198\" \/>\n\t<meta property=\"og:image:height\" content=\"624\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"R\u0103zvan Chiru\u021b\u0103\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"R\u0103zvan Chiru\u021b\u0103\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/grecii-de-pe-lotul-3-al-a0-sud-mai-optimisti-decat-ministerul-transporturilor-promit-ca-termina-santierul-in-aprilie\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/grecii-de-pe-lotul-3-al-a0-sud-mai-optimisti-decat-ministerul-transporturilor-promit-ca-termina-santierul-in-aprilie\\\/\"},\"author\":{\"name\":\"R\u0103zvan Chiru\u021b\u0103\",\"@id\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/#\\\/schema\\\/person\\\/a76df728dfc913795a9d90e346b253bb\"},\"headline\":\"Grecii de pe lotul 3 al A0 Sud, mai optimi\u0219ti dec\u00e2t Ministerul Transporturilor: promit c\u0103 termin\u0103 \u0219antierul \u00een aprilie\",\"datePublished\":\"2025-03-12T13:23:36+00:00\",\"dateModified\":\"2025-03-12T13:34:11+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/grecii-de-pe-lotul-3-al-a0-sud-mai-optimisti-decat-ministerul-transporturilor-promit-ca-termina-santierul-in-aprilie\\\/\"},\"wordCount\":813,\"publisher\":{\"@id\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/grecii-de-pe-lotul-3-al-a0-sud-mai-optimisti-decat-ministerul-transporturilor-promit-ca-termina-santierul-in-aprilie\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/wp-content\\\/uploads\\\/2025\\\/03\\\/a0sud-e1741785767750.png\",\"keywords\":[\"A0\",\"a0 lot 3\",\"a0 lot 3 sud\",\"A0 Sud\",\"a0-a2 nod rutier\",\"aktor\"],\"articleSection\":[\"Articole\",\"Main\",\"Transport\"],\"inLanguage\":\"en-GB\",\"copyrightYear\":\"2025\",\"copyrightHolder\":{\"@id\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/#organization\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/grecii-de-pe-lotul-3-al-a0-sud-mai-optimisti-decat-ministerul-transporturilor-promit-ca-termina-santierul-in-aprilie\\\/\",\"url\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/grecii-de-pe-lotul-3-al-a0-sud-mai-optimisti-decat-ministerul-transporturilor-promit-ca-termina-santierul-in-aprilie\\\/\",\"name\":\"Grecii de pe lotul 3 al A0 Sud, mai optimi\u0219ti dec\u00e2t Ministerul Transporturilor: promit c\u0103 termin\u0103 \u0219antierul \u00een aprilie - Buletin de Bucure\u0219ti\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/grecii-de-pe-lotul-3-al-a0-sud-mai-optimisti-decat-ministerul-transporturilor-promit-ca-termina-santierul-in-aprilie\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/grecii-de-pe-lotul-3-al-a0-sud-mai-optimisti-decat-ministerul-transporturilor-promit-ca-termina-santierul-in-aprilie\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/wp-content\\\/uploads\\\/2025\\\/03\\\/a0sud-e1741785767750.png\",\"datePublished\":\"2025-03-12T13:23:36+00:00\",\"dateModified\":\"2025-03-12T13:34:11+00:00\",\"description\":\"Constructorul grec care lucreaz\u0103 pe lotul 3 al A0 Sud afirm\u0103 c\u0103 \u00eel poate da \u00een circula\u021bie p\u00e2n\u0103 la finalul lui aprilie.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/grecii-de-pe-lotul-3-al-a0-sud-mai-optimisti-decat-ministerul-transporturilor-promit-ca-termina-santierul-in-aprilie\\\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/grecii-de-pe-lotul-3-al-a0-sud-mai-optimisti-decat-ministerul-transporturilor-promit-ca-termina-santierul-in-aprilie\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/grecii-de-pe-lotul-3-al-a0-sud-mai-optimisti-decat-ministerul-transporturilor-promit-ca-termina-santierul-in-aprilie\\\/#primaryimage\",\"url\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/wp-content\\\/uploads\\\/2025\\\/03\\\/a0sud-e1741785767750.png\",\"contentUrl\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/wp-content\\\/uploads\\\/2025\\\/03\\\/a0sud-e1741785767750.png\",\"width\":1198,\"height\":624,\"caption\":\"Lotul 3 al A0 Sud ar putea fi gata \u00een aprilie\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/grecii-de-pe-lotul-3-al-a0-sud-mai-optimisti-decat-ministerul-transporturilor-promit-ca-termina-santierul-in-aprilie\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Acas\u0103\",\"item\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Grecii de pe lotul 3 al A0 Sud, mai optimi\u0219ti dec\u00e2t Ministerul Transporturilor: promit c\u0103 termin\u0103 \u0219antierul \u00een aprilie\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/#website\",\"url\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/\",\"name\":\"Buletin de Bucure\u0219ti\",\"description\":\"\u0218tiri \u0219i investiga\u021bii esen\u021biale din capital\u0103\",\"publisher\":{\"@id\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/#organization\",\"name\":\"Buletin de Bucure\u0219ti\",\"url\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/wp-content\\\/uploads\\\/logo-bdb-full-wide-vernil-transparent.png\",\"contentUrl\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/wp-content\\\/uploads\\\/logo-bdb-full-wide-vernil-transparent.png\",\"width\":1782,\"height\":626,\"caption\":\"Buletin de Bucure\u0219ti\"},\"image\":{\"@id\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/buletin.de.buc\",\"https:\\\/\\\/www.instagram.com\\\/buletinde.bucuresti\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/#\\\/schema\\\/person\\\/a76df728dfc913795a9d90e346b253bb\",\"name\":\"R\u0103zvan Chiru\u021b\u0103\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/wp-content\\\/uploads\\\/Razvan-Chiruta-96x96.jpge7143b996fd4241fbd6ee1f6b6b7b267\",\"url\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/wp-content\\\/uploads\\\/Razvan-Chiruta-96x96.jpg\",\"contentUrl\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/wp-content\\\/uploads\\\/Razvan-Chiruta-96x96.jpg\",\"caption\":\"R\u0103zvan Chiru\u021b\u0103\"},\"description\":\"R\u0103zvan Chiru\u021b\u0103 este redactor-\u0219ef adjunct din iulie 2024. A fost redactor-\u0219ef al PRESShub \u00eentre 2022 \u0219i iunie 2024. Anterior, a fost redactor-\u0219ef al Newsweek Rom\u00e2nia, din 2018 p\u00e2n\u0103 \u00een 2021, \u0219i al cotidianului Rom\u00e2nia liber\u0103, \u00eentre 2015 \u0219i 2017. Este absolvent de Jurnalism, \u00een cadrul Universit\u0103\u021bii \u201eAl.I.Cuza\u201d din Ia\u0219i, \u0219i a urmat un master \u00een Managementul institu\u021biilor mass-media (f\u0103r\u0103 diserta\u021bie) la Facultatea de Jurnalism \u0219i \u0218tiin\u021bele Comunic\u0103rii din cadrul Universit\u0103\u021bii din Bucure\u0219ti. \u0218i-a \u00eenceput cariera la Opinia studen\u021beasc\u0103, cunoscuta \u0219coal\u0103 de pres\u0103 din Ia\u0219i. A lucrat \u00een presa local\u0103, apoi a devenit corespondent pentru Ia\u0219i al cotidianului Evenimentul Zilei. Din 2004, a coordonat pentru \u0219ase luni sec\u021bia de coresponden\u021bi a Evenimentului Zilei. A mai lucrat la s\u0103pt\u0103m\u00e2nalul Prezent \u0219i a colaborat cu revistele Dilema Veche \u0219i Suplimentul de Cultur\u0103. Este co-autor \u00een volumele \u201eMass-media \u0219i democra\u021bia \u00een Rom\u00e2nia post-comunist\u0103\u201d (ed. a II-a), Ed. Institutul European, Ia\u0219i, 2013, \u0219i \u201eCOVID - 19. Dimensiuni ale gestionarii pandemiei\u201d, Editura Junimea, Ia\u0219i, 2020.\",\"url\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/author\\\/razvan-chiruta\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Grecii de pe lotul 3 al A0 Sud, mai optimi\u0219ti dec\u00e2t Ministerul Transporturilor: promit c\u0103 termin\u0103 \u0219antierul \u00een aprilie - Buletin de Bucure\u0219ti","description":"Constructorul grec care lucreaz\u0103 pe lotul 3 al A0 Sud afirm\u0103 c\u0103 \u00eel poate da \u00een circula\u021bie p\u00e2n\u0103 la finalul lui aprilie.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/buletin.de\/bucuresti\/grecii-de-pe-lotul-3-al-a0-sud-mai-optimisti-decat-ministerul-transporturilor-promit-ca-termina-santierul-in-aprilie\/","og_locale":"en_GB","og_type":"article","og_title":"Grecii de pe lotul 3 al A0 Sud, mai optimi\u0219ti dec\u00e2t Ministerul Transporturilor: promit c\u0103 termin\u0103 \u0219antierul \u00een aprilie","og_description":"Constructorul grec care lucreaz\u0103 pe lotul 3 al A0 Sud afirm\u0103 c\u0103 \u00eel poate da \u00een circula\u021bie p\u00e2n\u0103 la finalul lui aprilie.","og_url":"https:\/\/buletin.de\/bucuresti\/grecii-de-pe-lotul-3-al-a0-sud-mai-optimisti-decat-ministerul-transporturilor-promit-ca-termina-santierul-in-aprilie\/","og_site_name":"Buletin de Bucure\u0219ti","article_publisher":"https:\/\/www.facebook.com\/buletin.de.buc","article_published_time":"2025-03-12T13:23:36+00:00","article_modified_time":"2025-03-12T13:34:11+00:00","og_image":[{"width":1198,"height":624,"url":"https:\/\/buletin.de\/bucuresti\/wp-content\/uploads\/2025\/03\/a0sud-e1741785767750.png","type":"image\/png"}],"author":"R\u0103zvan Chiru\u021b\u0103","twitter_card":"summary_large_image","twitter_misc":{"Written by":"R\u0103zvan Chiru\u021b\u0103","Estimated reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/buletin.de\/bucuresti\/grecii-de-pe-lotul-3-al-a0-sud-mai-optimisti-decat-ministerul-transporturilor-promit-ca-termina-santierul-in-aprilie\/#article","isPartOf":{"@id":"https:\/\/buletin.de\/bucuresti\/grecii-de-pe-lotul-3-al-a0-sud-mai-optimisti-decat-ministerul-transporturilor-promit-ca-termina-santierul-in-aprilie\/"},"author":{"name":"R\u0103zvan Chiru\u021b\u0103","@id":"https:\/\/buletin.de\/bucuresti\/#\/schema\/person\/a76df728dfc913795a9d90e346b253bb"},"headline":"Grecii de pe lotul 3 al A0 Sud, mai optimi\u0219ti dec\u00e2t Ministerul Transporturilor: promit c\u0103 termin\u0103 \u0219antierul \u00een aprilie","datePublished":"2025-03-12T13:23:36+00:00","dateModified":"2025-03-12T13:34:11+00:00","mainEntityOfPage":{"@id":"https:\/\/buletin.de\/bucuresti\/grecii-de-pe-lotul-3-al-a0-sud-mai-optimisti-decat-ministerul-transporturilor-promit-ca-termina-santierul-in-aprilie\/"},"wordCount":813,"publisher":{"@id":"https:\/\/buletin.de\/bucuresti\/#organization"},"image":{"@id":"https:\/\/buletin.de\/bucuresti\/grecii-de-pe-lotul-3-al-a0-sud-mai-optimisti-decat-ministerul-transporturilor-promit-ca-termina-santierul-in-aprilie\/#primaryimage"},"thumbnailUrl":"https:\/\/buletin.de\/bucuresti\/wp-content\/uploads\/2025\/03\/a0sud-e1741785767750.png","keywords":["A0","a0 lot 3","a0 lot 3 sud","A0 Sud","a0-a2 nod rutier","aktor"],"articleSection":["Articole","Main","Transport"],"inLanguage":"en-GB","copyrightYear":"2025","copyrightHolder":{"@id":"https:\/\/buletin.de\/bucuresti\/#organization"}},{"@type":"WebPage","@id":"https:\/\/buletin.de\/bucuresti\/grecii-de-pe-lotul-3-al-a0-sud-mai-optimisti-decat-ministerul-transporturilor-promit-ca-termina-santierul-in-aprilie\/","url":"https:\/\/buletin.de\/bucuresti\/grecii-de-pe-lotul-3-al-a0-sud-mai-optimisti-decat-ministerul-transporturilor-promit-ca-termina-santierul-in-aprilie\/","name":"Grecii de pe lotul 3 al A0 Sud, mai optimi\u0219ti dec\u00e2t Ministerul Transporturilor: promit c\u0103 termin\u0103 \u0219antierul \u00een aprilie - Buletin de Bucure\u0219ti","isPartOf":{"@id":"https:\/\/buletin.de\/bucuresti\/#website"},"primaryImageOfPage":{"@id":"https:\/\/buletin.de\/bucuresti\/grecii-de-pe-lotul-3-al-a0-sud-mai-optimisti-decat-ministerul-transporturilor-promit-ca-termina-santierul-in-aprilie\/#primaryimage"},"image":{"@id":"https:\/\/buletin.de\/bucuresti\/grecii-de-pe-lotul-3-al-a0-sud-mai-optimisti-decat-ministerul-transporturilor-promit-ca-termina-santierul-in-aprilie\/#primaryimage"},"thumbnailUrl":"https:\/\/buletin.de\/bucuresti\/wp-content\/uploads\/2025\/03\/a0sud-e1741785767750.png","datePublished":"2025-03-12T13:23:36+00:00","dateModified":"2025-03-12T13:34:11+00:00","description":"Constructorul grec care lucreaz\u0103 pe lotul 3 al A0 Sud afirm\u0103 c\u0103 \u00eel poate da \u00een circula\u021bie p\u00e2n\u0103 la finalul lui aprilie.","breadcrumb":{"@id":"https:\/\/buletin.de\/bucuresti\/grecii-de-pe-lotul-3-al-a0-sud-mai-optimisti-decat-ministerul-transporturilor-promit-ca-termina-santierul-in-aprilie\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/buletin.de\/bucuresti\/grecii-de-pe-lotul-3-al-a0-sud-mai-optimisti-decat-ministerul-transporturilor-promit-ca-termina-santierul-in-aprilie\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/buletin.de\/bucuresti\/grecii-de-pe-lotul-3-al-a0-sud-mai-optimisti-decat-ministerul-transporturilor-promit-ca-termina-santierul-in-aprilie\/#primaryimage","url":"https:\/\/buletin.de\/bucuresti\/wp-content\/uploads\/2025\/03\/a0sud-e1741785767750.png","contentUrl":"https:\/\/buletin.de\/bucuresti\/wp-content\/uploads\/2025\/03\/a0sud-e1741785767750.png","width":1198,"height":624,"caption":"Lotul 3 al A0 Sud ar putea fi gata \u00een aprilie"},{"@type":"BreadcrumbList","@id":"https:\/\/buletin.de\/bucuresti\/grecii-de-pe-lotul-3-al-a0-sud-mai-optimisti-decat-ministerul-transporturilor-promit-ca-termina-santierul-in-aprilie\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Acas\u0103","item":"https:\/\/buletin.de\/bucuresti\/"},{"@type":"ListItem","position":2,"name":"Grecii de pe lotul 3 al A0 Sud, mai optimi\u0219ti dec\u00e2t Ministerul Transporturilor: promit c\u0103 termin\u0103 \u0219antierul \u00een aprilie"}]},{"@type":"WebSite","@id":"https:\/\/buletin.de\/bucuresti\/#website","url":"https:\/\/buletin.de\/bucuresti\/","name":"Buletin de Bucure\u0219ti","description":"\u0218tiri \u0219i investiga\u021bii esen\u021biale din capital\u0103","publisher":{"@id":"https:\/\/buletin.de\/bucuresti\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/buletin.de\/bucuresti\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Organization","@id":"https:\/\/buletin.de\/bucuresti\/#organization","name":"Buletin de Bucure\u0219ti","url":"https:\/\/buletin.de\/bucuresti\/","logo":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/buletin.de\/bucuresti\/#\/schema\/logo\/image\/","url":"https:\/\/buletin.de\/bucuresti\/wp-content\/uploads\/logo-bdb-full-wide-vernil-transparent.png","contentUrl":"https:\/\/buletin.de\/bucuresti\/wp-content\/uploads\/logo-bdb-full-wide-vernil-transparent.png","width":1782,"height":626,"caption":"Buletin de Bucure\u0219ti"},"image":{"@id":"https:\/\/buletin.de\/bucuresti\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/buletin.de.buc","https:\/\/www.instagram.com\/buletinde.bucuresti\/"]},{"@type":"Person","@id":"https:\/\/buletin.de\/bucuresti\/#\/schema\/person\/a76df728dfc913795a9d90e346b253bb","name":"R\u0103zvan Chiru\u021b\u0103","image":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/buletin.de\/bucuresti\/wp-content\/uploads\/Razvan-Chiruta-96x96.jpge7143b996fd4241fbd6ee1f6b6b7b267","url":"https:\/\/buletin.de\/bucuresti\/wp-content\/uploads\/Razvan-Chiruta-96x96.jpg","contentUrl":"https:\/\/buletin.de\/bucuresti\/wp-content\/uploads\/Razvan-Chiruta-96x96.jpg","caption":"R\u0103zvan Chiru\u021b\u0103"},"description":"R\u0103zvan Chiru\u021b\u0103 este redactor-\u0219ef adjunct din iulie 2024. A fost redactor-\u0219ef al PRESShub \u00eentre 2022 \u0219i iunie 2024. Anterior, a fost redactor-\u0219ef al Newsweek Rom\u00e2nia, din 2018 p\u00e2n\u0103 \u00een 2021, \u0219i al cotidianului Rom\u00e2nia liber\u0103, \u00eentre 2015 \u0219i 2017. Este absolvent de Jurnalism, \u00een cadrul Universit\u0103\u021bii \u201eAl.I.Cuza\u201d din Ia\u0219i, \u0219i a urmat un master \u00een Managementul institu\u021biilor mass-media (f\u0103r\u0103 diserta\u021bie) la Facultatea de Jurnalism \u0219i \u0218tiin\u021bele Comunic\u0103rii din cadrul Universit\u0103\u021bii din Bucure\u0219ti. \u0218i-a \u00eenceput cariera la Opinia studen\u021beasc\u0103, cunoscuta \u0219coal\u0103 de pres\u0103 din Ia\u0219i. A lucrat \u00een presa local\u0103, apoi a devenit corespondent pentru Ia\u0219i al cotidianului Evenimentul Zilei. Din 2004, a coordonat pentru \u0219ase luni sec\u021bia de coresponden\u021bi a Evenimentului Zilei. A mai lucrat la s\u0103pt\u0103m\u00e2nalul Prezent \u0219i a colaborat cu revistele Dilema Veche \u0219i Suplimentul de Cultur\u0103. Este co-autor \u00een volumele \u201eMass-media \u0219i democra\u021bia \u00een Rom\u00e2nia post-comunist\u0103\u201d (ed. a II-a), Ed. Institutul European, Ia\u0219i, 2013, \u0219i \u201eCOVID - 19. Dimensiuni ale gestionarii pandemiei\u201d, Editura Junimea, Ia\u0219i, 2020.","url":"https:\/\/buletin.de\/bucuresti\/author\/razvan-chiruta\/"}]}},"authors":[{"term_id":22582,"user_id":60,"is_guest":0,"slug":"razvan-chiruta","display_name":"R\u0103zvan Chiru\u021b\u0103","avatar_url":"https:\/\/buletin.de\/bucuresti\/wp-content\/uploads\/Razvan-Chiruta-96x96.jpg","0":null,"1":"","2":"","3":"","4":"","5":"","6":"","7":"","8":""}],"_links":{"self":[{"href":"https:\/\/buletin.de\/bucuresti\/wp-json\/wp\/v2\/posts\/122356","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/buletin.de\/bucuresti\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/buletin.de\/bucuresti\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/buletin.de\/bucuresti\/wp-json\/wp\/v2\/users\/60"}],"replies":[{"embeddable":true,"href":"https:\/\/buletin.de\/bucuresti\/wp-json\/wp\/v2\/comments?post=122356"}],"version-history":[{"count":5,"href":"https:\/\/buletin.de\/bucuresti\/wp-json\/wp\/v2\/posts\/122356\/revisions"}],"predecessor-version":[{"id":122369,"href":"https:\/\/buletin.de\/bucuresti\/wp-json\/wp\/v2\/posts\/122356\/revisions\/122369"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/buletin.de\/bucuresti\/wp-json\/wp\/v2\/media\/122361"}],"wp:attachment":[{"href":"https:\/\/buletin.de\/bucuresti\/wp-json\/wp\/v2\/media?parent=122356"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/buletin.de\/bucuresti\/wp-json\/wp\/v2\/categories?post=122356"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/buletin.de\/bucuresti\/wp-json\/wp\/v2\/tags?post=122356"},{"taxonomy":"author","embeddable":true,"href":"https:\/\/buletin.de\/bucuresti\/wp-json\/wp\/v2\/ppma_author?post=122356"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}