{"id":120068,"date":"2025-02-26T07:23:00","date_gmt":"2025-02-26T04:23:00","guid":{"rendered":"https:\/\/buletin.de\/bucuresti\/?p=120068"},"modified":"2025-02-27T13:54:35","modified_gmt":"2025-02-27T10:54:35","slug":"inca-un-contract-inmanat-societatii-algorithm-constructii-peste-26-milioane-lei-pentru-prima-pista-de-pumptrack-din-sectorul-3","status":"publish","type":"post","link":"https:\/\/buletin.de\/bucuresti\/inca-un-contract-inmanat-societatii-algorithm-constructii-peste-26-milioane-lei-pentru-prima-pista-de-pumptrack-din-sectorul-3\/","title":{"rendered":"\u00cenc\u0103 un contract \u00eenm\u00e2nat societ\u0103\u021bii Algorithm Construc\u021bii. Peste 2,6 milioane lei pentru prima pist\u0103 de pumptrack din Sectorul 3"},"content":{"rendered":"\n<p><strong>Prima pist\u0103 de pumptrack din Sectorul 3 ar urma s\u0103 fie amenajat\u0103 \u00een decursul acestui an, cu peste 2,6 milioane lei (TVA inclus), conform unui proiect de hot\u0103r\u00e2re aflat pe masa Consiliului Local.<\/strong><\/p>\n\n\n\n<p><strong>Banii ar urma s\u0103 ajung\u0103 la Algorithm Construc\u021bii S3, compania municipal\u0103 \u00eenfiin\u021bat\u0103 \u00een 2017 pentru reabilitarea Halei Laminor. <\/strong><\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\"><strong>Update 27 februarie:<\/strong> <\/mark><strong>Proiectul a fost retras de pe ordinea de zi.<\/strong><\/p>\n\n\n\n<p><em>\u201eDin p\u0103cate, \u00een cadrul comisiei, argumentele aduse de direc\u021bia de specialitate nu au fost suficient de conving\u0103toare, din simplul motiv al faptului c\u0103 <strong>studiul pe care s-a bazat acest proiect, aceast\u0103 atribuire de contract nu a fost prezentat. <\/strong>(&#8230;)<\/em><\/p>\n\n\n\n<p><em>Am conchis c\u0103 e mai bine ca acest proiect s\u0103  fie mai bine fundamentat \u0219i s\u0103 revin\u0103 \u00eentr-o dat\u0103 viitoare cu o solu\u021bie care s\u0103-i conving\u0103 pe to\u021bi \u0219i<strong> s\u0103 nu ne trezim cu improviza\u021bii pe teren<\/strong>, ci cu adev\u0103rat o investi\u021bie public\u0103 necesar\u0103 pentru tinerii care practic\u0103 sportul\u201d<\/em>, a declarat Eugen Matei, consilier local al Sectorului 3 \u0219i membru \u00een comisia juridic\u0103, respectiv economic\u0103.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-prima-pista-de-pumptrack-din-sectorul-3-loca\u021bie-mister\">Prima pist\u0103 de pumptrack din Sectorul 3, loca\u021bie mister<\/h2>\n\n\n\n<p><strong><a href=\"https:\/\/www.primarie3.ro\/images\/uploads\/consiliu_local\/Punctul_19_suplimentar_din_27.02.2025.pdf\">Proiectul de hot\u0103r\u00e2re <\/a>exclude detalii esen\u021biale despre pista de pumptrack, cum ar fi locul unde ar urma s\u0103 fie amenajat\u0103, lungimea sau tipul construc\u021biei (modular\/nemodular).<\/strong><\/p>\n\n\n\n<p>Concret, consilierii locali ai Sectorului 3 vor vota atribuirea contractului de 2,6 milioane lei c\u0103tre Algorithm Construc\u021bii S3, \u00een baza ofertei primite de la compania municipal\u0103.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"900\" height=\"207\" src=\"data:image\/gif;base64,R0lGODlhAQABAAAAACH5BAEKAAEALAAAAAABAAEAAAICTAEAOw==\" data-src=\"https:\/\/buletin.de\/bucuresti\/wp-content\/uploads\/Pista-900x207.png\" alt=\"\" class=\"wp-image-120166 lazyload\" data-sizes=\"auto\" data-srcset=\"https:\/\/buletin.de\/bucuresti\/wp-content\/uploads\/Pista-900x207.png 900w, https:\/\/buletin.de\/bucuresti\/wp-content\/uploads\/Pista-300x69.png 300w, https:\/\/buletin.de\/bucuresti\/wp-content\/uploads\/Pista-768x176.png 768w, https:\/\/buletin.de\/bucuresti\/wp-content\/uploads\/Pista-1100x253.png 1100w, https:\/\/buletin.de\/bucuresti\/wp-content\/uploads\/Pista-600x138.png 600w, https:\/\/buletin.de\/bucuresti\/wp-content\/uploads\/Pista-20x5.png 20w, https:\/\/buletin.de\/bucuresti\/wp-content\/uploads\/Pista.png 1346w\" sizes=\"(max-width: 900px) 100vw, 900px\" \/><figcaption class=\"wp-element-caption\">Pista de pumptrack din Sectorul 3 ar urma s\u0103 coste 2,6 milioane lei<\/figcaption><\/figure>\n\n\n\n<p>Conform modelului de contract anexat, durata lucr\u0103rilor ar urma s\u0103 fie:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>60 de zile pentru proiectare<\/li>\n\n\n\n<li>90 zile pentru execu\u021bie<\/li>\n<\/ul>\n\n\n\n<p>\u00cen ceea ce prive\u0219te garan\u021bia, documentul prevede un termen de patru ani: \u201ePerioada de garan\u021bie curge de la data recep\u021biei la terminarea lucr\u0103rilor, p\u00e2n\u0103 la recep\u021bia final\u0103 \u0219i este de 48 luni\u201d.<\/p>\n\n\n\n<p>De-a lungul anilor, Algorithm Construc\u021bii a \u00eencasat milioane de euro din bugetul local al Sectorului 3, pentru a se ocupa de diverse investi\u021bii, precum <a href=\"https:\/\/buletin.de\/bucuresti\/sector-3-proiect-in-parcul-pantelimon-in-valoare-de-11-8-milioane-de-euro\/\">parcul de distrac\u021bii promis \u00een Pantelimon<\/a>, <a href=\"https:\/\/buletin.de\/bucuresti\/sector-3-proiectele-controversate-ale-podului-si-gardului-de-tabla-galvanizata-sunt-din-nou-pe-ordinea-de-zi\/\">montarea de garduri galvanizate<\/a> sau <a href=\"https:\/\/buletin.de\/bucuresti\/robert-negoita-plateste-sase-milioane-de-euro-pentru-contracte-cu-difuzori-media-tv-si-online-ca-sa-faca-promovare-institutionala\/\">\u201epromovarea institu\u021bional\u0103\u201d<\/a>.<\/p>\n\n\n\n<p><strong>CITE\u0218TE \u0218I: <a href=\"https:\/\/buletin.de\/bucuresti\/algorithm-constructii-s3-dupa-investigatia-bdb-primarul-negoita-a-vizitat-pepiniere-exotice-un-mega-parc-de-aventuri-si-un-targ-pentru-industria-atractiilor\/\">Algorithm Construc\u021bii S3, dup\u0103 investiga\u0163ia BdB: Primarul Negoi\u0163\u0103 a vizitat pepiniere exotice, un mega-parc de aventuri \u0219i un t\u00e2rg pentru \u201eindustria atrac\u021biilor\u201c<\/a><\/strong><\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-pumptrack-\u0219i-in-sectoarele-1-\u0219i-6\">Pumptrack \u0219i \u00een sectoarele 1 \u0219i 6<\/h2>\n\n\n\n<p>Pumptrack-ul este un concept relativ nou la noi \u00een \u021bar\u0103, practicat cu prec\u0103dere de tineri. <\/p>\n\n\n\n<p>Vorbim de o pist\u0103 special conceput\u0103, care are curbe pe \u00een\u0103l\u021bimi diferite pentru echipamente sportive pe ro\u021bi (biciclete, skateboard-uri, role, etc.) care nu necesit\u0103 pedalare sau \u00eempingere, ci doar o ac\u021biune de \u201epompare\u201d pentru a genera impuls prin mi\u0219c\u0103rile corpului \u00een sus \u0219i \u00een jos.<\/p>\n\n\n\n<p>\u0218i prim\u0103riile sectoarelor 1 \u0219i 6 au f\u0103cut astfel de investi\u021bii. Prima pist\u0103 de pumptrack din asfalt a fost inaugurat\u0103 \u00een iunie 2024, \u00een cartierul Pajura, la intersec\u0163ia str\u0103zilor Dridu \u015fi Jiului, a\u0219a cum a scris Buletin de Bucure\u0219ti <a href=\"https:\/\/buletin.de\/bucuresti\/sector-1-se-inaugureaza-pista-de-pumptrack-de-la-intersectia-dridu-jiului\/\">aici.<\/a><\/p>\n\n\n\n<p>Piste modulare de pumptrack au fost inaugurate \u00een Capital\u0103 \u00eenc\u0103 din 2022, de Prim\u0103ria Sectorului 6. Prima a fost amenajat\u0103 \u00een parcul Constantin Br\u00e2ncu\u015fi din cartierul ANL, iar cea de-a doua \u00een Parcul Cr\u00e2nga\u0219i.<\/p>\n\n\n\n<p><strong>CITE\u0218TE \u0218I:<\/strong> <strong><a href=\"https:\/\/buletin.de\/bucuresti\/a-doua-pista-de-tip-pumptrack-din-bucuresti-s-a-deschis-in-parcul-crangasi\/\">A doua pist\u0103 de tip pumptrack din Bucure\u0219ti s-a deschis \u00een Parcul Cr\u00e2nga\u0219i<\/a><\/strong><br><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Prima pist\u0103 de pumptrack din Sectorul 3 ar urma s\u0103 fie amenajat\u0103 \u00een decursul acestui an, cu peste 2,6 milioane lei (TVA inclus), conform unui proiect de hot\u0103r\u00e2re aflat pe masa Consiliului Local. Banii ar urma s\u0103 ajung\u0103 la Algorithm Construc\u021bii S3, compania municipal\u0103 \u00eenfiin\u021bat\u0103 \u00een 2017 pentru reabilitarea Halei Laminor. Update 27 februarie: Proiectul [&hellip;]<\/p>\n","protected":false},"author":55,"featured_media":120167,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"ngg_post_thumbnail":0,"footnotes":""},"categories":[6994,5762,24],"tags":[19431,9,14289,19428,19429,308,440,523,369],"ppma_author":[22573],"class_list":["post-120068","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-stiri-2","category-main","category-primarie","tag-algorithm-constructii-s3","tag-bucuresti","tag-consiliu-local-sector-3","tag-pista-de-pumptrack","tag-pumptrack","tag-sector-1","tag-sector-3","tag-sector-6","tag-sport"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v25.3 (Yoast SEO v27.5) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>\u00cenc\u0103 un contract \u00eenm\u00e2nat societ\u0103\u021bii Algorithm Construc\u021bii. Peste 2,6 milioane lei pentru prima pist\u0103 de pumptrack din Sectorul 3 - Buletin de Bucure\u0219ti<\/title>\n<meta name=\"description\" content=\"Prima pist\u0103 de pumptrack din Sectorul 3 ar urma s\u0103 fie amenajat\u0103 \u00een decursul acestui an, cu peste 2,6 milioane lei (TVA inclus).\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/buletin.de\/bucuresti\/inca-un-contract-inmanat-societatii-algorithm-constructii-peste-26-milioane-lei-pentru-prima-pista-de-pumptrack-din-sectorul-3\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"\u00cenc\u0103 un contract \u00eenm\u00e2nat societ\u0103\u021bii Algorithm Construc\u021bii. Peste 2,6 milioane lei pentru prima pist\u0103 de pumptrack din Sectorul 3\" \/>\n<meta property=\"og:description\" content=\"Prima pist\u0103 de pumptrack din Sectorul 3 ar urma s\u0103 fie amenajat\u0103 \u00een decursul acestui an, cu peste 2,6 milioane lei (TVA inclus).\" \/>\n<meta property=\"og:url\" content=\"https:\/\/buletin.de\/bucuresti\/inca-un-contract-inmanat-societatii-algorithm-constructii-peste-26-milioane-lei-pentru-prima-pista-de-pumptrack-din-sectorul-3\/\" \/>\n<meta property=\"og:site_name\" content=\"Buletin de Bucure\u0219ti\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/buletin.de.buc\" \/>\n<meta property=\"article:published_time\" content=\"2025-02-26T04:23:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-02-27T10:54:35+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/buletin.de\/bucuresti\/wp-content\/uploads\/shove4btoi4.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1600\" \/>\n\t<meta property=\"og:image:height\" content=\"1067\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Andreea Tudor\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Andreea Tudor\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/inca-un-contract-inmanat-societatii-algorithm-constructii-peste-26-milioane-lei-pentru-prima-pista-de-pumptrack-din-sectorul-3\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/inca-un-contract-inmanat-societatii-algorithm-constructii-peste-26-milioane-lei-pentru-prima-pista-de-pumptrack-din-sectorul-3\\\/\"},\"author\":{\"name\":\"Andreea Tudor\",\"@id\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/#\\\/schema\\\/person\\\/150590659efde715459d159da012f501\"},\"headline\":\"\u00cenc\u0103 un contract \u00eenm\u00e2nat societ\u0103\u021bii Algorithm Construc\u021bii. Peste 2,6 milioane lei pentru prima pist\u0103 de pumptrack din Sectorul 3\",\"datePublished\":\"2025-02-26T04:23:00+00:00\",\"dateModified\":\"2025-02-27T10:54:35+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/inca-un-contract-inmanat-societatii-algorithm-constructii-peste-26-milioane-lei-pentru-prima-pista-de-pumptrack-din-sectorul-3\\\/\"},\"wordCount\":569,\"publisher\":{\"@id\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/inca-un-contract-inmanat-societatii-algorithm-constructii-peste-26-milioane-lei-pentru-prima-pista-de-pumptrack-din-sectorul-3\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/wp-content\\\/uploads\\\/shove4btoi4.jpg\",\"keywords\":[\"algorithm constructii s3\",\"bucuresti\",\"consiliu local sector 3\",\"pista de pumptrack\",\"pumptrack\",\"Sector 1\",\"Sector 3\",\"Sector 6\",\"sport\"],\"articleSection\":[\"Articole\",\"Main\",\"Prim\u0103rie\"],\"inLanguage\":\"en-GB\",\"copyrightYear\":\"2025\",\"copyrightHolder\":{\"@id\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/#organization\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/inca-un-contract-inmanat-societatii-algorithm-constructii-peste-26-milioane-lei-pentru-prima-pista-de-pumptrack-din-sectorul-3\\\/\",\"url\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/inca-un-contract-inmanat-societatii-algorithm-constructii-peste-26-milioane-lei-pentru-prima-pista-de-pumptrack-din-sectorul-3\\\/\",\"name\":\"\u00cenc\u0103 un contract \u00eenm\u00e2nat societ\u0103\u021bii Algorithm Construc\u021bii. Peste 2,6 milioane lei pentru prima pist\u0103 de pumptrack din Sectorul 3 - Buletin de Bucure\u0219ti\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/inca-un-contract-inmanat-societatii-algorithm-constructii-peste-26-milioane-lei-pentru-prima-pista-de-pumptrack-din-sectorul-3\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/inca-un-contract-inmanat-societatii-algorithm-constructii-peste-26-milioane-lei-pentru-prima-pista-de-pumptrack-din-sectorul-3\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/wp-content\\\/uploads\\\/shove4btoi4.jpg\",\"datePublished\":\"2025-02-26T04:23:00+00:00\",\"dateModified\":\"2025-02-27T10:54:35+00:00\",\"description\":\"Prima pist\u0103 de pumptrack din Sectorul 3 ar urma s\u0103 fie amenajat\u0103 \u00een decursul acestui an, cu peste 2,6 milioane lei (TVA inclus).\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/inca-un-contract-inmanat-societatii-algorithm-constructii-peste-26-milioane-lei-pentru-prima-pista-de-pumptrack-din-sectorul-3\\\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/inca-un-contract-inmanat-societatii-algorithm-constructii-peste-26-milioane-lei-pentru-prima-pista-de-pumptrack-din-sectorul-3\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/inca-un-contract-inmanat-societatii-algorithm-constructii-peste-26-milioane-lei-pentru-prima-pista-de-pumptrack-din-sectorul-3\\\/#primaryimage\",\"url\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/wp-content\\\/uploads\\\/shove4btoi4.jpg\",\"contentUrl\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/wp-content\\\/uploads\\\/shove4btoi4.jpg\",\"width\":1600,\"height\":1067,\"caption\":\"\u00cenc\u0103 un contract \u00eenm\u00e2nat societ\u0103\u021bii Algorithm Construc\u021bii. Peste 2,6 milioane lei pentru prima pist\u0103 de pumptrack din Sectorul 3. Foto: Unsplash\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/inca-un-contract-inmanat-societatii-algorithm-constructii-peste-26-milioane-lei-pentru-prima-pista-de-pumptrack-din-sectorul-3\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Acas\u0103\",\"item\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"\u00cenc\u0103 un contract \u00eenm\u00e2nat societ\u0103\u021bii Algorithm Construc\u021bii. Peste 2,6 milioane lei pentru prima pist\u0103 de pumptrack din Sectorul 3\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/#website\",\"url\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/\",\"name\":\"Buletin de Bucure\u0219ti\",\"description\":\"\u0218tiri \u0219i investiga\u021bii esen\u021biale din capital\u0103\",\"publisher\":{\"@id\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/#organization\",\"name\":\"Buletin de Bucure\u0219ti\",\"url\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/wp-content\\\/uploads\\\/logo-bdb-full-wide-vernil-transparent.png\",\"contentUrl\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/wp-content\\\/uploads\\\/logo-bdb-full-wide-vernil-transparent.png\",\"width\":1782,\"height\":626,\"caption\":\"Buletin de Bucure\u0219ti\"},\"image\":{\"@id\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/buletin.de.buc\",\"https:\\\/\\\/www.instagram.com\\\/buletinde.bucuresti\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/#\\\/schema\\\/person\\\/150590659efde715459d159da012f501\",\"name\":\"Andreea Tudor\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/a88705a186ab0b67f3349bcbced506c09e37256fbaad0e7f3bd1a79b4599f589?s=96&d=monsterid&r=g79290610aa1a65c2b86eebc2ca5aee8f\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/a88705a186ab0b67f3349bcbced506c09e37256fbaad0e7f3bd1a79b4599f589?s=96&d=monsterid&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/a88705a186ab0b67f3349bcbced506c09e37256fbaad0e7f3bd1a79b4599f589?s=96&d=monsterid&r=g\",\"caption\":\"Andreea Tudor\"},\"description\":\"N\u0103scut\u0103 \u0219i crescut\u0103 \u00een Bucure\u0219ti, sus\u021bin\u0103toare a presei independente. A\u0219a am ajuns redactor la Buletin de Bucure\u0219ti. Fiind eu, \u00eens\u0103mi, parte a sistemului de \u00eenv\u0103\u021b\u0103m\u00e2nt rom\u00e2nesc \u0219i pasionat\u0103 de domeniul social, pun sub lup\u0103 tot ceea ce se \u00eent\u00e2mpl\u0103 \u00een sfera educa\u021biei. Cred cu t\u0103rie c\u0103 presa \u201epentru cet\u0103\u021beni\u201d este presa independent\u0103. Oamenii au nevoie de o informare corect\u0103 pentru a \u00een\u021belege pe deplin ce se \u00eent\u00e2mpl\u0103 \u00een jurul lor \u0219i pentru a lua ac\u021biune \u00eempotriva nedrept\u0103\u021bilor.\",\"url\":\"https:\\\/\\\/buletin.de\\\/bucuresti\\\/author\\\/andreeatudor\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"\u00cenc\u0103 un contract \u00eenm\u00e2nat societ\u0103\u021bii Algorithm Construc\u021bii. Peste 2,6 milioane lei pentru prima pist\u0103 de pumptrack din Sectorul 3 - Buletin de Bucure\u0219ti","description":"Prima pist\u0103 de pumptrack din Sectorul 3 ar urma s\u0103 fie amenajat\u0103 \u00een decursul acestui an, cu peste 2,6 milioane lei (TVA inclus).","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/buletin.de\/bucuresti\/inca-un-contract-inmanat-societatii-algorithm-constructii-peste-26-milioane-lei-pentru-prima-pista-de-pumptrack-din-sectorul-3\/","og_locale":"en_GB","og_type":"article","og_title":"\u00cenc\u0103 un contract \u00eenm\u00e2nat societ\u0103\u021bii Algorithm Construc\u021bii. Peste 2,6 milioane lei pentru prima pist\u0103 de pumptrack din Sectorul 3","og_description":"Prima pist\u0103 de pumptrack din Sectorul 3 ar urma s\u0103 fie amenajat\u0103 \u00een decursul acestui an, cu peste 2,6 milioane lei (TVA inclus).","og_url":"https:\/\/buletin.de\/bucuresti\/inca-un-contract-inmanat-societatii-algorithm-constructii-peste-26-milioane-lei-pentru-prima-pista-de-pumptrack-din-sectorul-3\/","og_site_name":"Buletin de Bucure\u0219ti","article_publisher":"https:\/\/www.facebook.com\/buletin.de.buc","article_published_time":"2025-02-26T04:23:00+00:00","article_modified_time":"2025-02-27T10:54:35+00:00","og_image":[{"width":1600,"height":1067,"url":"https:\/\/buletin.de\/bucuresti\/wp-content\/uploads\/shove4btoi4.jpg","type":"image\/jpeg"}],"author":"Andreea Tudor","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Andreea Tudor","Estimated reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/buletin.de\/bucuresti\/inca-un-contract-inmanat-societatii-algorithm-constructii-peste-26-milioane-lei-pentru-prima-pista-de-pumptrack-din-sectorul-3\/#article","isPartOf":{"@id":"https:\/\/buletin.de\/bucuresti\/inca-un-contract-inmanat-societatii-algorithm-constructii-peste-26-milioane-lei-pentru-prima-pista-de-pumptrack-din-sectorul-3\/"},"author":{"name":"Andreea Tudor","@id":"https:\/\/buletin.de\/bucuresti\/#\/schema\/person\/150590659efde715459d159da012f501"},"headline":"\u00cenc\u0103 un contract \u00eenm\u00e2nat societ\u0103\u021bii Algorithm Construc\u021bii. Peste 2,6 milioane lei pentru prima pist\u0103 de pumptrack din Sectorul 3","datePublished":"2025-02-26T04:23:00+00:00","dateModified":"2025-02-27T10:54:35+00:00","mainEntityOfPage":{"@id":"https:\/\/buletin.de\/bucuresti\/inca-un-contract-inmanat-societatii-algorithm-constructii-peste-26-milioane-lei-pentru-prima-pista-de-pumptrack-din-sectorul-3\/"},"wordCount":569,"publisher":{"@id":"https:\/\/buletin.de\/bucuresti\/#organization"},"image":{"@id":"https:\/\/buletin.de\/bucuresti\/inca-un-contract-inmanat-societatii-algorithm-constructii-peste-26-milioane-lei-pentru-prima-pista-de-pumptrack-din-sectorul-3\/#primaryimage"},"thumbnailUrl":"https:\/\/buletin.de\/bucuresti\/wp-content\/uploads\/shove4btoi4.jpg","keywords":["algorithm constructii s3","bucuresti","consiliu local sector 3","pista de pumptrack","pumptrack","Sector 1","Sector 3","Sector 6","sport"],"articleSection":["Articole","Main","Prim\u0103rie"],"inLanguage":"en-GB","copyrightYear":"2025","copyrightHolder":{"@id":"https:\/\/buletin.de\/bucuresti\/#organization"}},{"@type":"WebPage","@id":"https:\/\/buletin.de\/bucuresti\/inca-un-contract-inmanat-societatii-algorithm-constructii-peste-26-milioane-lei-pentru-prima-pista-de-pumptrack-din-sectorul-3\/","url":"https:\/\/buletin.de\/bucuresti\/inca-un-contract-inmanat-societatii-algorithm-constructii-peste-26-milioane-lei-pentru-prima-pista-de-pumptrack-din-sectorul-3\/","name":"\u00cenc\u0103 un contract \u00eenm\u00e2nat societ\u0103\u021bii Algorithm Construc\u021bii. Peste 2,6 milioane lei pentru prima pist\u0103 de pumptrack din Sectorul 3 - Buletin de Bucure\u0219ti","isPartOf":{"@id":"https:\/\/buletin.de\/bucuresti\/#website"},"primaryImageOfPage":{"@id":"https:\/\/buletin.de\/bucuresti\/inca-un-contract-inmanat-societatii-algorithm-constructii-peste-26-milioane-lei-pentru-prima-pista-de-pumptrack-din-sectorul-3\/#primaryimage"},"image":{"@id":"https:\/\/buletin.de\/bucuresti\/inca-un-contract-inmanat-societatii-algorithm-constructii-peste-26-milioane-lei-pentru-prima-pista-de-pumptrack-din-sectorul-3\/#primaryimage"},"thumbnailUrl":"https:\/\/buletin.de\/bucuresti\/wp-content\/uploads\/shove4btoi4.jpg","datePublished":"2025-02-26T04:23:00+00:00","dateModified":"2025-02-27T10:54:35+00:00","description":"Prima pist\u0103 de pumptrack din Sectorul 3 ar urma s\u0103 fie amenajat\u0103 \u00een decursul acestui an, cu peste 2,6 milioane lei (TVA inclus).","breadcrumb":{"@id":"https:\/\/buletin.de\/bucuresti\/inca-un-contract-inmanat-societatii-algorithm-constructii-peste-26-milioane-lei-pentru-prima-pista-de-pumptrack-din-sectorul-3\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/buletin.de\/bucuresti\/inca-un-contract-inmanat-societatii-algorithm-constructii-peste-26-milioane-lei-pentru-prima-pista-de-pumptrack-din-sectorul-3\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/buletin.de\/bucuresti\/inca-un-contract-inmanat-societatii-algorithm-constructii-peste-26-milioane-lei-pentru-prima-pista-de-pumptrack-din-sectorul-3\/#primaryimage","url":"https:\/\/buletin.de\/bucuresti\/wp-content\/uploads\/shove4btoi4.jpg","contentUrl":"https:\/\/buletin.de\/bucuresti\/wp-content\/uploads\/shove4btoi4.jpg","width":1600,"height":1067,"caption":"\u00cenc\u0103 un contract \u00eenm\u00e2nat societ\u0103\u021bii Algorithm Construc\u021bii. Peste 2,6 milioane lei pentru prima pist\u0103 de pumptrack din Sectorul 3. Foto: Unsplash"},{"@type":"BreadcrumbList","@id":"https:\/\/buletin.de\/bucuresti\/inca-un-contract-inmanat-societatii-algorithm-constructii-peste-26-milioane-lei-pentru-prima-pista-de-pumptrack-din-sectorul-3\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Acas\u0103","item":"https:\/\/buletin.de\/bucuresti\/"},{"@type":"ListItem","position":2,"name":"\u00cenc\u0103 un contract \u00eenm\u00e2nat societ\u0103\u021bii Algorithm Construc\u021bii. Peste 2,6 milioane lei pentru prima pist\u0103 de pumptrack din Sectorul 3"}]},{"@type":"WebSite","@id":"https:\/\/buletin.de\/bucuresti\/#website","url":"https:\/\/buletin.de\/bucuresti\/","name":"Buletin de Bucure\u0219ti","description":"\u0218tiri \u0219i investiga\u021bii esen\u021biale din capital\u0103","publisher":{"@id":"https:\/\/buletin.de\/bucuresti\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/buletin.de\/bucuresti\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Organization","@id":"https:\/\/buletin.de\/bucuresti\/#organization","name":"Buletin de Bucure\u0219ti","url":"https:\/\/buletin.de\/bucuresti\/","logo":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/buletin.de\/bucuresti\/#\/schema\/logo\/image\/","url":"https:\/\/buletin.de\/bucuresti\/wp-content\/uploads\/logo-bdb-full-wide-vernil-transparent.png","contentUrl":"https:\/\/buletin.de\/bucuresti\/wp-content\/uploads\/logo-bdb-full-wide-vernil-transparent.png","width":1782,"height":626,"caption":"Buletin de Bucure\u0219ti"},"image":{"@id":"https:\/\/buletin.de\/bucuresti\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/buletin.de.buc","https:\/\/www.instagram.com\/buletinde.bucuresti\/"]},{"@type":"Person","@id":"https:\/\/buletin.de\/bucuresti\/#\/schema\/person\/150590659efde715459d159da012f501","name":"Andreea Tudor","image":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/secure.gravatar.com\/avatar\/a88705a186ab0b67f3349bcbced506c09e37256fbaad0e7f3bd1a79b4599f589?s=96&d=monsterid&r=g79290610aa1a65c2b86eebc2ca5aee8f","url":"https:\/\/secure.gravatar.com\/avatar\/a88705a186ab0b67f3349bcbced506c09e37256fbaad0e7f3bd1a79b4599f589?s=96&d=monsterid&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/a88705a186ab0b67f3349bcbced506c09e37256fbaad0e7f3bd1a79b4599f589?s=96&d=monsterid&r=g","caption":"Andreea Tudor"},"description":"N\u0103scut\u0103 \u0219i crescut\u0103 \u00een Bucure\u0219ti, sus\u021bin\u0103toare a presei independente. A\u0219a am ajuns redactor la Buletin de Bucure\u0219ti. Fiind eu, \u00eens\u0103mi, parte a sistemului de \u00eenv\u0103\u021b\u0103m\u00e2nt rom\u00e2nesc \u0219i pasionat\u0103 de domeniul social, pun sub lup\u0103 tot ceea ce se \u00eent\u00e2mpl\u0103 \u00een sfera educa\u021biei. Cred cu t\u0103rie c\u0103 presa \u201epentru cet\u0103\u021beni\u201d este presa independent\u0103. Oamenii au nevoie de o informare corect\u0103 pentru a \u00een\u021belege pe deplin ce se \u00eent\u00e2mpl\u0103 \u00een jurul lor \u0219i pentru a lua ac\u021biune \u00eempotriva nedrept\u0103\u021bilor.","url":"https:\/\/buletin.de\/bucuresti\/author\/andreeatudor\/"}]}},"authors":[{"term_id":22573,"user_id":55,"is_guest":0,"slug":"andreeatudor","display_name":"Andreea Tudor","avatar_url":"https:\/\/secure.gravatar.com\/avatar\/a88705a186ab0b67f3349bcbced506c09e37256fbaad0e7f3bd1a79b4599f589?s=96&d=monsterid&r=g","0":null,"1":"","2":"","3":"","4":"","5":"","6":"","7":"","8":""}],"_links":{"self":[{"href":"https:\/\/buletin.de\/bucuresti\/wp-json\/wp\/v2\/posts\/120068","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/buletin.de\/bucuresti\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/buletin.de\/bucuresti\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/buletin.de\/bucuresti\/wp-json\/wp\/v2\/users\/55"}],"replies":[{"embeddable":true,"href":"https:\/\/buletin.de\/bucuresti\/wp-json\/wp\/v2\/comments?post=120068"}],"version-history":[{"count":21,"href":"https:\/\/buletin.de\/bucuresti\/wp-json\/wp\/v2\/posts\/120068\/revisions"}],"predecessor-version":[{"id":120469,"href":"https:\/\/buletin.de\/bucuresti\/wp-json\/wp\/v2\/posts\/120068\/revisions\/120469"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/buletin.de\/bucuresti\/wp-json\/wp\/v2\/media\/120167"}],"wp:attachment":[{"href":"https:\/\/buletin.de\/bucuresti\/wp-json\/wp\/v2\/media?parent=120068"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/buletin.de\/bucuresti\/wp-json\/wp\/v2\/categories?post=120068"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/buletin.de\/bucuresti\/wp-json\/wp\/v2\/tags?post=120068"},{"taxonomy":"author","embeddable":true,"href":"https:\/\/buletin.de\/bucuresti\/wp-json\/wp\/v2\/ppma_author?post=120068"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}